International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : SG07 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R SG07  C 

ITU-R SG07

Science services

Results:97 total items.
Result page:  Previous -  1 - 2 - 3 - 4
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 22 ]  
 
2001-10-15 SG 7   Note to Study Group 9 - Draft new Recommendation ITU-R F.[PMP26 GHz]     N/A  
[ 21 ]  
 
2001-10-15 BRDMU   List of participants     N/A  
[ 20 ]  
 
2001-10-15 SG 9   Note to Study Group 7 - Draft new Recommendation ITU-R F. [PMP26GHz] - Technical and operational requirements that facilitate sharing between point-to-multipoint systems in the fixed service and the inter-satellite service in the band 25.25-27.5 GHz     N/A  
[ 19 ]  
 
2001-10-15 Chairman, SG 7   Scope of Study Group 7 Working Parties     N/A  
[ 18 ]  
 
2001-10-15 Chairman, WP 7A   Executive report on the Meeting of Working Party 7A (Geneva, 9-13 October 2000)     N/A  
[ 17 ]  
 
2001-10-15 WP 7A   Draft new Question [Doc. 7/17] - Instrumentation time codes     N/A  
[ 16 ]  
 
2001-10-15 WP 7A   Draft new Question [Doc. 7/16] - Trusted time source for time stamp authority     N/A  
[ 15 ]  
(Rev.1) 
2001-10-15 WP 7A   Draft revision of Recommendation ITU-R TF.768-3 - Standard frequencies and time signals     N/A  
[ 14 ]  
 
2001-10-15 WP 7A   Draft revision to Recommendation ITU-R TF.583-4 - Time codes     N/A  
[ 13 ]  
 
2001-10-15 JRG 7D/9D   Draft new Recommendation ITU-R F[PMP26GHz] - Technical and operational requirements that facilitate sharing between point-to-multipoint systems in the fixed service and the inter-satellite service in the bnad 25.25-27.5 GHz     N/A  
[ 12 ]  
 
2001-10-15 Chairman, WP 7E   Executive report on the meeting of Working Party 7E - Vancouver, July 2000     N/A  
[ 11 ]  
 
2001-10-15 Chairman, WP 7C   Executive Report on the Working Party 7C meeting (31 July - 4 August 2000)     N/A  
[ 10 ]  
 
2001-10-15 WP 7B   Executive Report on the meeting of Working Party 7B (January 2000 and August 2000)     N/A  
[ 9 ]  
 
2001-10-15 Chairman, WP 7D   Executive Report on the July/August 2000 meeting of Working Party 7D     N/A  
[ 8 ]  
 
2001-10-15 WP 8F   Liaison statement to WPs 8A, 8B and 8D and the relevant groups of SGs 1, 3, 4, 7 and 9     N/A  
[ 7 ]  
 
2001-10-15 Chairman, SG 7   Report to the Study Group in preparation for the study period 2000-2003     N/A  
[ 6 ]  
 
2001-10-15 WP 7B   Draft new Question ITU-R [Doc. 7/6] - Unwanted emissions radiated from and received by stations of the space science, the mobile and mobile-satellite services in the bands 2 025-2 110 MHz and 2 200-2 290 MHz and the bands 1 885-2 025 MHz and ..     N/A  
[ 5 ]  
 
2001-10-15 WP 7D   Draft new Question ITU-R [Doc.7/5] - Technical and operational factors relating to interference mitigation practices at radio astronomy stations     N/A  
[ 4 ]  
 
2001-10-15 WP 7A   Draft new Question ITU-R[TF.QQQ] [Doc. 7/4] - The future of the UTC time scale     N/A  
[ 3 ]  
 
2001-10-15 WP 7A   Draft revision of Question ITU-R 207-1/7 - Time and frequency transfer using digital communication links     N/A  
[ 2 ]  
 
2001-10-15 WP 7A   Draft revision to Question ITU-R 201-1/7 - Two-way time and frequency transfer through communication satellites     N/A  
[ 1 ]  
+Add.1-3 
2001-10-15 SG 7   Questions assigned to Study Group 7 by the Radiocommunication Assembly     N/A  
Results:97 total items.
Result page:  Previous -  1 - 2 - 3 - 4  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2003-06-16