Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 15 : Réunion 2014-03-24 : Documents Temporaires  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 15  TD-WP2 (2014-03-24) 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Période d'études 2013

Réunion  du 2014-03-24 au 2014-04-04

Lieu : Suisse [Genève]

Autres réunions : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  [ 2014-03-24 ]  2013-12-06  2013-07-01  2013-02-01 

Resultats:44 documents
Documents Temporaires  (WP2)   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 80-WP2 ]  
 
Report of the Q8/15 meeting (Geneva, March - April 2014)     Rapporteur Q8/15   Q8/15   2014-04-02
[ 79-WP2 ]  
 
Report of the Q6/15 meeting (Geneva, March - April 2014)     Rapporteur Q6/15   Q6/15   2014-04-02
[ 78-WP2 ]  
 
Report of the Q7/15 meeting (Geneva, March - April 2014)     Rapporteur Q7/15   Q7/15   2014-04-02
[ 77-WP2 ]  
 
Scope and summary for template from ITU-T A.1 for requesting SG15 approval for new Recommendation ITU-T L.91     Rapporteur Q16/15   Q16/15   2014-04-02
[ 76-WP2 ]  
 
Draft revised Recommendation ITU-T L.36 (version 2.0.1)     Rapporteur Q7/15   Q7/15   2014-04-01
[ 75-WP2 ]  
(Rev.1-2) 
Report of the Q5/15 meeting (Geneva, March - April 2014)     Rapporteur Q5/15   Q5/15   2014-03-31
[ 74-WP2 ]  
 
Report of the Q17/15 meeting (Geneva, March - April 2014)     Rapporteur Q17/15   Q17/15   2014-03-29
[ 73-WP2 ]  
(Rev.1-3) 
Report of the Q16/15 meeting (Geneva, March - April 2014)     Rapporteur Q16/15   Q16/15   2014-03-28
[ 72-WP2 ]  
 
Questionnaire on "micro-ducts technology and its application in the access network"     Rapporteur Q16/15   Q16/15   2014-03-28
[ 71-WP2 ]  
 
Agenda of the joint Q5, 17/15 meeting (Geneva, 26 March 2014): Attenuation coefficient at 1650 nm     Rapporteur Q5/15 , Rapporteur Q17/15   Q5/15, Q17/15   2014-03-25
[ 70-WP2 ]  
 
Agenda of the joint Q5, 6/15 meeting (Geneva, 26 March 2014): G.652 zero-dispersion wavelength     Rapporteur Q5/15 , Rapporteur Q6/15   Q6/15, Q5/15   2014-03-25
[ 69-WP2 ]  
(Rev.1) 
Reliability supplement: Correspondence report     Correspondence leader on reliability supplement   Q5/15   2014-03-24
[ 68-WP2 ]  
 
L.25: Correspondence summary     Editor L.25   Q17/15   2014-03-23
[ 67-WP2 ]  
 
LS/i on fibre optic cable shrinkage effects and proposal for test on multi fibre cables with central tube and loose tube construction [from ETSI TC ATTM]     ETSI TC ATTM   Q16/15   2014-03-21
[ 66-WP2 ]  
(Rev.1) 
Agenda of the Q16/15 meeting (Geneva, March - April 2014)     Rapporteur Q16/15   Q16/15   2014-03-20
[ 65-WP2 ]  
 
G.977: Correspondence summary     Editor G.977   Q8/15   2014-03-20
[ 64-WP2 ]  
 
WP2/15 proposed interim activities (for Agreement, 4 April 2014)     Chairman WP2/15   Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15   2014-03-19
[ 63-WP2 ]  
 
WP2/15 outgoing Liaison Statements (for Agreement, 4 April 2014)     Chairman WP2/15   Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15   2014-03-19
[ 62-WP2 ]  
(Rev.1) 
WP2/15 Work Programme updates     Chairman WP2/15   Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15   2014-03-19
[ 61-WP2 ]  
 
WP2/15 texts for Approval, Determination, Consent and Agreement (Geneva, 24 March - 4 April 2014)     Chairman WP2/15   Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15   2014-03-19
[ 60-WP2 ]  
 
WP2/15 meeting report (Geneva, 24 March - 4 April 2014)     Chairman WP2/15   Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15   2014-03-19
[ 59-WP2 ]  
(Rev.1-3) 
Agenda of the WP2/15 meeting (Geneva, March - April 2014)     Chairman WP1/15   Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15   2014-03-19
[ 58-WP2 ]  
(Rev.1) 
Agenda of the Q8/15 meeting (Geneva, March - April 2014)     Rapporteur Q8/15   Q8/15   2014-03-19
[ 57-WP2 ]  
 
Q8/15: Status report     Rapporteur Q8/15   Q8/15   2014-03-19
[ 56-WP2 ]  
(Rev.1-3) 
Proposal of questionnaire related to new study item "Plant solutions for FTTdp (fibre-to-the-distribution point) architecture"     Rapporteur Q16/15   Q16/15   2014-03-19
[ 55-WP2 ]  
(Rev.1) 
Agenda of the Q17/15 meeting (Geneva, March - April 2014)     Rapporteur Q17/15   Q17/15   2014-03-19
[ 54-WP2 ]  
(Rev.1) 
L.36 (Rev): Correspondence summary     Editor L.36   Q7/15   2014-03-18
[ 53-WP2 ]  
(Rev.1) 
Agenda of the Q7/15 meeting (Geneva, March - April 2014)     Rapporteur Q7/15   Q7/15   2014-03-18
[ 52-WP2 ]  
 
Agenda of the Q5/15 meeting (Geneva, March - April 2014)     Rapporteur Q5/15   Q5/15   2014-03-18
[ 51-WP2 ]  
 
L.53 (Rev): Correspondence summary     Editor L.53   Q17/15   2014-03-17
[ 50-WP2 ]  
 
G-Suppl.39: Latest draft (v5.0.2)     Editor G-Suppl.39   Q6/15   2014-03-17
[ 49-WP2 ]  
(Rev.1) 
G.698.2: Overview of contributions proposing parameters and related test methods for 40G and 100G modulation formats in G.698.2 Version 0.9.1     Editor G.698.2   Q6/15   2014-03-14
[ 48-WP2 ]  
(Rev.1) 
Agenda of the Q6/15 meeting (Geneva, March - April 2014)     Rapporteur Q6/15   Q6/15   2014-03-14
[ 47-WP2 ]  
 
Proposed application parameters for G.695 version 5.0.1     Editor G.695   Q6/15   2014-03-14
[ 46-WP2 ]  
 
Metro DWDM systems: Correspondence activity summary     Metro DWDM systems correspondence coordinator   Q6/15   2014-03-13
[ 45-WP2 ]  
 
L.10, 26 and 43: Correspondence summary     Editor L.10, 26 and 43   Q16/15   2014-03-13
[ 44-WP2 ]  
 
Proposed application parameters for G.698.3 version 1.0.2     Editor G.698.3   Q6/15   2014-03-12
[ 43-WP2 ]  
 
G.959.1: Latest draft (v6.0.2)     Editor G.959.1   Q6/15   2014-03-11
[ 42-WP2 ]  
 
Proposed application parameters for ITU-T G.959.1 version 6.0.2     Editor G.959.1   Q6/15   2014-03-11
[ 41-WP2 ]  
 
G.697: Editor's considerations on clauses that need modifications for 40 Gbit/s and 100 Gbit/s applications     Editor G.697   Q6/15   2014-03-10
[ 40-WP2 ]  
 
G.672: Latest draft (v1.0.1)     Editor G.672   Q7/15   2014-03-10
[ 39-WP2 ]  
 
G.650.2: Correspondence summary     Editor G.650.2   Q5/15   2014-03-09
[ 38-WP2 ]  
 
G.652 and G.657: Correspondence activity (December 2013 to March 2014)     Editor G.652, G.657   Q5/15   2014-03-04
[ 37-WP2 ]  
 
L.gpsm: Correspondence summary     Editor L.gpsm   Q17/15   2014-03-03
Resultats:44 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-4-19