Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 15 : Réunion 2014-03-24 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 15  C (2014-03-24) 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Période d'études 2013

Réunion  du 2014-03-24 au 2014-04-04

Lieu : Suisse [Genève]

Autres réunions : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2013-12-06  2013-07-01  2013-02-01 

Resultats:337 documents
Résultats :  1 - 2 - 3 - 4 - 5 - 6 - 7  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 777 ]  
 
Withdrawn by submitter     N/A     2014-03-12
[ 776 ]  
 
Proposed revision to G.984.5.2     Calix Networks, Inc. , Telecom Italia S.p.A.   Q2/15   2014-03-11
[ 775 ]  
(Rev.1) 
G.fast: BT TAP comments on G.9700 (ex G.fast-PSD)     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2014-03-11
[ 774 ]  
 
Parameterization of L2.1 multi-step entry procedure     Lantiq Beteiligungs-GmbH & Co. KG   Q4/15   2014-03-11
[ 773 ]  
 
G.997.1: On extending G.997.1 to support PMA functionality     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2014-03-11
[ 772 ]  
 
G.fast: On Reverse Power Feeding system noise requirements     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2014-03-11
[ 771 ]  
 
Document describing migration from other PTP profiles to G.8275.1     Nokia Solutions and Networks Gmbh & Co. KG   Q13/15   2014-03-11
[ 770 ]  
 
Updates to G.8263 Testing     Nokia Solutions and Networks Gmbh & Co. KG   Q13/15   2014-03-11
[ 769 ]  
 
Proposed revisions to G.989.2 LC document     British Telecommunications Public Ltd. Co. (BT Plc) , Calix Networks, Inc. , Telecom Italia S.p.A.   Q2/15   2014-03-11
[ 768 ]  
 
Neighbour Discovery for Ethernet     Coriant GmbH & Co. KG   Q14/15   2014-03-11
[ 767 ]  
 
G.vdsl2, G.inp: Stability issues and mitigation of non-stationary noise in LPM     Lantiq Beteiligungs-GmbH & Co. KG   Q4/15   2014-03-11
[ 766 ]  
 
G.fast: Additional requirements to address specifics of RPF noise     Lantiq Beteiligungs-GmbH & Co. KG   Q4/15   2014-03-11
[ 765 ]  
 
Out-of-Band protocol used to report OPS and OCh status     Coriant GmbH & Co. KG   Q14/15   2014-03-11
[ 764 ]  
 
G.vdsl: New 998ADE17 Band Plan for VDSL2     China Telecommunications Corporation , China Unicom , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q4/15   2014-03-11
[ 763 ]  
 
G.fast: Means for Transmission of Sync Symbols and RMC Symbols in L2.2     Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q4/15   2014-03-11
[ 762 ]  
 
G.fast: On TIGA and SRA     Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q4/15   2014-03-11
[ 761 ]  
 
Proposed model for the OTUCn and OTSi layers for OTN beyond 100G     ZTE Corporation   Q12/15, Q11/15   2014-03-11
[ 760 ]  
 
Considerations on the timing of the OTN B100G amendment for G.709     China Telecommunications Corporation , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q12/15, Q11/15   2014-03-11
[ 759 ]  
 
Access budget within E2E Time/phase HRM     British Telecommunications Public Ltd. Co. (BT Plc)   Q13/15   2014-03-11
[ 758 ]  
 
Prysmian Group view on revision of Recs. G.652 and G.657     Prysmian SpA   Q6/15, Q5/15   2014-03-11
[ 757 ]  
 
Updated draft of recommendation for "Field Mountable optical fibre Connector"     Telecom Italia S.p.A. , Tyco Electronics Raychem bvba   Q7/15   2014-03-11
[ 756 ]  
 
Proposal of a new study item: "Plant solutions for FTTdp (Fiber To The distribution point) architecture"     Italy   Q4/15, Q16/15   2014-03-11
[ 755 ]  
 
Simplified analytical approach for modelling of WDM Systems to be considered as the way forward to develop a specification method for Situation 2 in G.680     Italy   Q6/15   2014-03-11
[ 754 ]  
 
Monitoring models for G.8031 protected domain with DNI to support two failures in G.mdsp     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2014-03-11
[ 753 ]  
 
Isolation specifications for G.984.5 Revised     British Telecommunications Public Ltd. Co. (BT Plc)   Q2/15   2014-03-11
[ 752 ]  
 
Discussion of transfer time and DRNI for G.mdsp     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2014-03-11
[ 751 ]  
 
G.fast: Proposed Liaison to ETSI TM6 on RPF Noise     Alcatel-Lucent France   Q4/15   2014-03-11
[ 750 ]  
(Rev.1) 
VDSL2 and G.FAST need a flexible protection mechanism against time varying noise.     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2014-03-11
[ 749 ]  
 
G.fast: Data rate impact and requirements of Reverse Power Feeding systems     Alcatel-Lucent France   Q4/15   2014-03-11
[ 748 ]  
 
G.inp: G.vdsl: VDSL2 Low Power Mode: Mandatory support of Virtual Noise     Alcatel-Lucent France   Q4/15   2014-03-11
[ 747 ]  
 
Information on Upcoming New Work on B100G OTN     Huawei Technologies Co. Ltd.   Q13/15, Q11/15   2014-03-11
[ 746 ]  
 
G.fast: DTU's mapping and ACK bit-map structure (section 9.5)     Sckipio Technologies S.I. Ltd.   Q4/15   2014-03-11
[ 745 ]  
 
G.fast: Alcatel-Lucent TAP comments on G.9700 (ex G.fast-PSD)     Alcatel-Lucent France   Q4/15   2014-03-11
[ 744 ]  
 
Proposal for seeded DWDM system with support for tunable channels     Deutsche Telekom AG , Transmode Systems AB   Q6/15   2014-03-11
[ 743 ]  
 
Co-existence of seeded technology and tunable transmitters     Deutsche Telekom AG , Transmode Systems AB   Q6/15   2014-03-11
[ 742 ]  
 
Efficient mapping of CPRI over ODUflex     FiberHome Technologies Group , IP Light , OKI Electric Industry Company Ltd. (OKI)   Q11/15   2014-03-11
[ 741 ]  
 
Comments on latest G.MDSP Living List     Alcatel-Lucent France   Q9/15   2014-03-11
[ 740 ]  
 
Comments on latest G.MDSP draft     Alcatel-Lucent France   Q9/15   2014-03-11
[ 739 ]  
(Rev.1) 
Proposal of new recommendation on studying wavelength selective optical distribution networks and related system in Q2/SG15     China Mobile Communications Corporation , China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q2/15   2014-03-11
[ 738 ]  
 
Proposal for Interoperation ability for ODU SMP     China Mobile Communications Corporation   Q9/15   2014-03-11
[ 737 ]  
 
Synchronization over OTN: application scenarios and standardization requirements for different OTN interface structures     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q13/15, Q11/15   2014-03-11
[ 736 ]  
 
Frequency and time synchronization over OTN: requirements, implementation, deployments and test performance     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q13/15, Q11/15   2014-03-11
[ 735 ]  
 
Proposal on Synchronization OAM in packet networks     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q13/15, Q10/15   2014-03-11
[ 734 ]  
 
Proposal for clockClass definition     China   Q13/15   2014-03-11
[ 733 ]  
 
SDN requirements in carrier's transport networks     China Mobile Communications Corporation   Q12/15   2014-03-11
[ 732 ]  
 
Discussions of Proposed draft text for G.8131     China Mobile Communications Corporation   Q9/15   2014-03-11
[ 731 ]  
 
Update of the table listing the ITU-T Recommendations suitable for conformity/interoperability testing     Iometrix, Inc.   Q13/15   2014-03-11
[ 730 ]  
 
C&I pilot project for Synchronous Ethernet technology     Iometrix, Inc.   Q13/15   2014-03-11
[ 729 ]  
 
Clarification of PTP unicast communication for G.8275.2 and G.8265.1 - request for unicast transmission of multiple types of PTP messages using Signaling messages     Iometrix, Inc.   Q13/15   2014-03-11
[ 728 ]  
 
Guidance on the usage of the methods for PDV tolerance testing in G.8263     Iometrix, Inc. , Orange   Q13/15   2014-03-11
Resultats:337 documents
Résultats :  1 - 2 - 3 - 4 - 5 - 6 - 7  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-3-28