International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2014-03-24 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2014-03-24) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2014-03-24 to 2014-04-04

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2013-12-06  2013-07-01  2013-02-01 

Results:337 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 777 ]  
 
2014-03-12 N/A   Withdrawn by submitter     N/A  
[ 776 ]  
 
2014-03-11 Calix Networks, Inc. , Telecom Italia S.p.A.   Proposed revision to G.984.5.2     Q2/15  
[ 775 ]  
(Rev.1) 
2014-03-11 British Telecommunications Public Ltd. Co. (BT Plc)   G.fast: BT TAP comments on G.9700 (ex G.fast-PSD)     Q4/15  
[ 774 ]  
 
2014-03-11 Lantiq Beteiligungs-GmbH & Co. KG   Parameterization of L2.1 multi-step entry procedure     Q4/15  
[ 773 ]  
 
2014-03-11 British Telecommunications Public Ltd. Co. (BT Plc)   G.997.1: On extending G.997.1 to support PMA functionality     Q4/15  
[ 772 ]  
 
2014-03-11 British Telecommunications Public Ltd. Co. (BT Plc)   G.fast: On Reverse Power Feeding system noise requirements     Q4/15  
[ 771 ]  
 
2014-03-11 Nokia Solutions and Networks Gmbh & Co. KG   Document describing migration from other PTP profiles to G.8275.1     Q13/15  
[ 770 ]  
 
2014-03-11 Nokia Solutions and Networks Gmbh & Co. KG   Updates to G.8263 Testing     Q13/15  
[ 769 ]  
 
2014-03-11 British Telecommunications Public Ltd. Co. (BT Plc) , Calix Networks, Inc. , Telecom Italia S.p.A.   Proposed revisions to G.989.2 LC document     Q2/15  
[ 768 ]  
 
2014-03-11 Coriant GmbH & Co. KG   Neighbour Discovery for Ethernet     Q14/15  
[ 767 ]  
 
2014-03-11 Lantiq Beteiligungs-GmbH & Co. KG   G.vdsl2, G.inp: Stability issues and mitigation of non-stationary noise in LPM     Q4/15  
[ 766 ]  
 
2014-03-11 Lantiq Beteiligungs-GmbH & Co. KG   G.fast: Additional requirements to address specifics of RPF noise     Q4/15  
[ 765 ]  
 
2014-03-11 Coriant GmbH & Co. KG   Out-of-Band protocol used to report OPS and OCh status     Q14/15  
[ 764 ]  
 
2014-03-11 China Telecommunications Corporation , China Unicom , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   G.vdsl: New 998ADE17 Band Plan for VDSL2     Q4/15  
[ 763 ]  
 
2014-03-11 Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   G.fast: Means for Transmission of Sync Symbols and RMC Symbols in L2.2     Q4/15  
[ 762 ]  
 
2014-03-11 Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   G.fast: On TIGA and SRA     Q4/15  
[ 761 ]  
 
2014-03-11 ZTE Corporation   Proposed model for the OTUCn and OTSi layers for OTN beyond 100G     Q12/15, Q11/15  
[ 760 ]  
 
2014-03-11 China Telecommunications Corporation , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Considerations on the timing of the OTN B100G amendment for G.709     Q12/15, Q11/15  
[ 759 ]  
 
2014-03-11 British Telecommunications Public Ltd. Co. (BT Plc)   Access budget within E2E Time/phase HRM     Q13/15  
[ 758 ]  
 
2014-03-11 Prysmian SpA   Prysmian Group view on revision of Recs. G.652 and G.657     Q6/15, Q5/15  
[ 757 ]  
 
2014-03-11 Telecom Italia S.p.A. , Tyco Electronics Raychem bvba   Updated draft of recommendation for "Field Mountable optical fibre Connector"     Q7/15  
[ 756 ]  
 
2014-03-11 Italy   Proposal of a new study item: "Plant solutions for FTTdp (Fiber To The distribution point) architecture"     Q4/15, Q16/15  
[ 755 ]  
 
2014-03-11 Italy   Simplified analytical approach for modelling of WDM Systems to be considered as the way forward to develop a specification method for Situation 2 in G.680     Q6/15  
[ 754 ]  
 
2014-03-11 Electronics and Telecommunications Research Institute (ETRI)   Monitoring models for G.8031 protected domain with DNI to support two failures in G.mdsp     Q9/15  
[ 753 ]  
 
2014-03-11 British Telecommunications Public Ltd. Co. (BT Plc)   Isolation specifications for G.984.5 Revised     Q2/15  
[ 752 ]  
 
2014-03-11 Electronics and Telecommunications Research Institute (ETRI)   Discussion of transfer time and DRNI for G.mdsp     Q9/15  
[ 751 ]  
 
2014-03-11 Alcatel-Lucent France   G.fast: Proposed Liaison to ETSI TM6 on RPF Noise     Q4/15  
[ 750 ]  
(Rev.1) 
2014-03-11 British Telecommunications Public Ltd. Co. (BT Plc)   VDSL2 and G.FAST need a flexible protection mechanism against time varying noise.     Q4/15  
[ 749 ]  
 
2014-03-11 Alcatel-Lucent France   G.fast: Data rate impact and requirements of Reverse Power Feeding systems     Q4/15  
[ 748 ]  
 
2014-03-11 Alcatel-Lucent France   G.inp: G.vdsl: VDSL2 Low Power Mode: Mandatory support of Virtual Noise     Q4/15  
[ 747 ]  
 
2014-03-11 Huawei Technologies Co. Ltd.   Information on Upcoming New Work on B100G OTN     Q13/15, Q11/15  
[ 746 ]  
 
2014-03-11 Sckipio Technologies S.I. Ltd.   G.fast: DTU's mapping and ACK bit-map structure (section 9.5)     Q4/15  
[ 745 ]  
 
2014-03-11 Alcatel-Lucent France   G.fast: Alcatel-Lucent TAP comments on G.9700 (ex G.fast-PSD)     Q4/15  
[ 744 ]  
 
2014-03-11 Deutsche Telekom AG , Transmode Systems AB   Proposal for seeded DWDM system with support for tunable channels     Q6/15  
[ 743 ]  
 
2014-03-11 Deutsche Telekom AG , Transmode Systems AB   Co-existence of seeded technology and tunable transmitters     Q6/15  
[ 742 ]  
 
2014-03-11 FiberHome Technologies Group , IP Light , OKI Electric Industry Company Ltd. (OKI)   Efficient mapping of CPRI over ODUflex     Q11/15  
[ 741 ]  
 
2014-03-11 Alcatel-Lucent France   Comments on latest G.MDSP Living List     Q9/15  
[ 740 ]  
 
2014-03-11 Alcatel-Lucent France   Comments on latest G.MDSP draft     Q9/15  
[ 739 ]  
(Rev.1) 
2014-03-11 China Mobile Communications Corporation , China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Proposal of new recommendation on studying wavelength selective optical distribution networks and related system in Q2/SG15     Q2/15  
[ 738 ]  
 
2014-03-11 China Mobile Communications Corporation   Proposal for Interoperation ability for ODU SMP     Q9/15  
[ 737 ]  
 
2014-03-11 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Synchronization over OTN: application scenarios and standardization requirements for different OTN interface structures     Q13/15, Q11/15  
[ 736 ]  
 
2014-03-11 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Frequency and time synchronization over OTN: requirements, implementation, deployments and test performance     Q13/15, Q11/15  
[ 735 ]  
 
2014-03-11 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Proposal on Synchronization OAM in packet networks     Q13/15, Q10/15  
[ 734 ]  
 
2014-03-11 China   Proposal for clockClass definition     Q13/15  
[ 733 ]  
 
2014-03-11 China Mobile Communications Corporation   SDN requirements in carrier's transport networks     Q12/15  
[ 732 ]  
 
2014-03-11 China Mobile Communications Corporation   Discussions of Proposed draft text for G.8131     Q9/15  
[ 731 ]  
 
2014-03-11 Iometrix, Inc.   Update of the table listing the ITU-T Recommendations suitable for conformity/interoperability testing     Q13/15  
[ 730 ]  
 
2014-03-11 Iometrix, Inc.   C&I pilot project for Synchronous Ethernet technology     Q13/15  
[ 729 ]  
 
2014-03-11 Iometrix, Inc.   Clarification of PTP unicast communication for G.8275.2 and G.8265.1 - request for unicast transmission of multiple types of PTP messages using Signaling messages     Q13/15  
[ 728 ]  
 
2014-03-11 Iometrix, Inc. , Orange   Guidance on the usage of the methods for PDV tolerance testing in G.8263     Q13/15  
Results:337 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-5-3