International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 3 : Meeting 2013-05-27 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG 3  TD (2013-05-27) 

ITU-T SG 3

Economic and policy issues

Study Period 2013

Meeting  from 2013-05-27 to 2013-05-31

held in Switzerland [Geneva]

Other Meetings : 2016-02-22  2015-03-16  2014-05-26  [ 2013-05-27 ] 

Results:84 total items.
Result page:  1 - 2  - Next Next
Temporary Documents  (PLEN)   Documents / Contributions
 
Number 
Received Source Title Questions
[ 84-PLEN ]  
(Rev.1) 
2013-05-31 BDT   Outcomes of the ITU Regional Forum for Arab Region: IMT Systems Technology, Evolution and Implementation     QALL/3  
[ 83-PLEN ]  
 
2013-05-31 Chairman of SG3   LS/o to JCA-AHF on nomination of a representatives [to ITU-T Study Groups, TSAG and ITU-R Study Groups] in the JCA-AHF     QALL/3  
[ 82-PLEN ]  
 
2013-05-31 Chairman of SG3   LS/o on request to provide security contacts from SG17     QALL/3  
[ 81-PLEN ]  
(Rev.1) 
2013-05-31 ITU-SG3   LS/o - Response to SG2 request regarding holding back to back meetings     QALL/3  
[ 80-PLEN ]  
(Rev.1) 
2013-05-31 Chairman of Study Group 3   Chairman's Discussion Paper on Working Methods and Structure of SG3     QALL/3  
[ 79-PLEN ]  
(Rev.1) 
2013-05-31 ITU T Study Group 3   LS/o - Response to Invitation to participate in and provide input to the work of the Correspondence Group on the Elaboration of a Working Definition of the Term "ICT"     Q5/3  
[ 78-PLEN ]  
(Rev.1) 
2013-05-31 SG3 Vice-chairman   Anticipated draft Report of Ad-Hoc Group on Regional Cost Models and Question 4/3     Q4/3  
[ 77-PLEN ]  
(Rev.1) 
2013-05-30 Chairman of SG3   List of rapporteurs and ad-hoc groups PLEN     QALL/3  
[ 76-PLEN ]  
(Rev.1) 
2013-05-30 Chairman SG3   Dates for future meetings     QALL/3  
[ 75-PLEN ]  
 
2013-05-30 ITU-T SG3   LS/o to SG2 on Telecommunication Management and OAM Project Plan     QALL/3  
[ 74-PLEN ]  
 
2013-05-30 ITU-T SG3   LS/o to JCA-IoT on Internet of things workplan     QALL/3  
[ 73-PLEN ]  
 
2013-05-30 ITU-T SG3   LS/o to JCA-COP on Child online protection activity     QALL/3  
[ 72-PLEN ]  
 
2013-05-30 ITU-T SG3   LS/o to JCA-SG&HN on activities related to smart grid     QALL/3  
[ 71-PLEN ]  
 
2013-05-29 Chairman SG3   List of Orphaned/Dormant Recommendations for SG3     QALL/3  
[ 70-PLEN ]  
(Rev.1) 
2013-05-29 Convener   LS/o to ITU-T SG2 on a joint Correspondence Group on Studying the economic Impact of call-back, refiling and inappropriate hubbing and other forms of alternative calling procedures, as well as origin non-identification or spoofing     Q2/3  
[ 69-PLEN ]  
(Rev.1-2) 
2013-05-28 Chairman WP1/3   LS/o to ITU T SG2 on Draft Terms of reference on Joint Rapporteur's Group studying the Economic aspects of deploying IPv6 addresses     Q1/3  
[ 68-PLEN ]  
(Rev.1) 
2013-05-28 Chairman WP1/3   Draft Terms of Reference for Proposed Joint Rapporteur Group of Study Groups 2 and 3 on the economic aspects of transitioning from IPv4 to IPv6     Q1/3  
[ 67-PLEN ]  
(Rev.1) 
2013-05-28 Rapporteur   Draft Terms of Reference for the Rapporteur Group on the Study of the Use of Commercial Agreements for International Telecommunications Services Arrangements     Q2/3  
[ 66-PLEN ]  
 
2013-05-28 Chairman WP3/3   LS/o to SG2 on the definition and list of "international telecommunication services"     Q3/3  
[ 65-PLEN ]  
 
2013-05-28 Convener   Draft Terms of Reference for Correspondence Group on Studying the economic Impact of call-back, refiling and inappropriate hubbing and other forms of alternative calling procedures, as well as origin non-identification or spoofing     Q2/3  
[ 64-PLEN ]  
 
2013-05-28 ITU   Summary of Outcomes of WTPF     QALL/3  
[ 63-PLEN ]  
 
2013-05-27 Chairman, Working Party 1/3   Proposals for the terms of reference of the Rapporteur's Group for a new Supplement to Recommendation D.50 and other outputs if necessary     Q1/3  
[ 62-PLEN ]  
 
2013-05-27 TSB   Mailing Lists for SG3     QALL/3  
[ 61-PLEN ]  
 
2013-05-27 WTPF Chairman   Chairman's Report on WTPF     QALL/3  
[ 60-PLEN ]  
(Rev.1-2) 
2013-05-27 Rapporteur on Roaming (2009-2012 study period)   Draft Terms of Reference for Mobile Roaming Rapporteur Group     Q2/3  
[ 59-PLEN ]  
 
2013-05-26 Leader of Q4/3   Draft agenda for Q4/3 (Regional studies for the development of cost models)     Q4/3  
[ 58-PLEN ]  
 
2013-05-24 N/A   Document withdrawn     N/A  
[ 57-PLEN ]  
 
2013-05-23 Joint Coordination Activity on Accessibility and H   LS/i on nomination of JCA-AHF representatives [from JCA-AHF]     QALL/3  
[ 56-PLEN ]  
(Rev.1-2) 
2013-05-20 TSB   List of Contributions     QALL/3  
[ 55-PLEN ]  
(Rev.1) 
2013-05-16 Chairman of SG3   Proposed SG 3 structure, leadership and Rapporteurs     QAll/3  
[ 54-PLEN ]  
(Rev.1) 
2013-05-24 TSB   WCIT/WTSA Issues - Proposed Mapping to Working Parties and Rapporteur Groups     N/A  
[ 53-PLEN ]  
(Rev.1) 
2013-05-16 Rapporteur of group on dispute prevention and resolution   Guidelines For Fraud Mitigation     Q2/3  
[ 52-PLEN ]  
(Rev.1) 
2013-05-16 Rapporteur of group on dispute prevention and resolution   Prepayment Guidelines     Q2/3  
[ 51-PLEN ]  
(Rev.1) 
2013-05-16 Rapporteur of group on dispute prevention and resolution   Day Sales Outstanding Management Guidelines     Q2/3  
[ 50-PLEN ]  
(Rev.1) 
2013-05-16 Rapporteur of group on dispute prevention and resolution   Credit Management Guidelines     Q2/3  
[ 49-PLEN ]  
(Rev.1) 
2013-05-16 Rapporteur of group on dispute prevention and resolution   Summary of work of the Rapporteur Group on dispute prevention and resolution  
Cover note for TDs 50-53
 
Q2/3  
[ 48-PLEN ]  
 
2013-05-08 SG3 Chairman, SG2 Chairman   Areas for cooperation between SG2 and SG3 following WTSA-12 Resolutions     QALL/3  
[ 47-PLEN ]  
(Rev.1) 
2013-05-07 TSB   List of work items for Study Group 3     QALL/3  
[ 46-PLEN ]  
 
2013-05-02 FG-DR&NRR   LS/i on status report of the Focus Group on Disaster Relief Systems, Network Resilience and Recovery [from FG-DR&NRR]     QALL/3  
[ 45-PLEN ]  
 
2013-05-01 ITU-T SG17   LS/i on request to provide security contacts [from SG17]     QALL/3  
[ 44-PLEN ]  
 
2013-05-01 ITU-T SG17   LS/i on continuation of JCA-COP with revised ToR to TSAG [from SG17]     QALL/3  
[ 43-PLEN ]  
 
2013-05-01 ITU-T SG17   LS/i on continuation of JCA-IdM with revised ToR to TSAG [from SG17]     QALL/3  
[ 42-PLEN ]  
 
2013-05-01 IETF IAB   LS/i on appointment of a new IETF Liaison Manager to the ITU-T from IETF IAB [form IETF IAB]     QALL/3  
[ 41-PLEN ]  
 
2013-05-01 ITU-T SG13   LS/i on plans for implementation of Resolution 77 and recommendations to TSAG [from SG13]     QALL/3  
[ 40-PLEN ]  
 
2013-04-30 BDT   Regulation of international roaming in the European Union - Lessons learned     Q2/3  
[ 39-PLEN ]  
 
2013-04-25 SG3RG-AFR   The impact of the Internet on Voice and SMS Traffic     Q2/3, Q1/3  
[ 38-PLEN ]  
 
2013-04-25 SG3RG-AFR   Subjects for consideration     QALL/3  
[ 37-PLEN ]  
 
2013-05-16 SG3RG-AFR   Draft guidelines for annex/supplement of D.50     QALL/3  
[ 36-PLEN ]  
 
2013-04-18 TSB   WTSA-12 and WCIT-12: Significant items of relevance for the work of Study Group 3     QALL/3  
[ 35-PLEN ]  
 
2013-04-04 TSB   Presentation on the submission of Contributions to ITU-T     QAll/3  
Results:84 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2015-03-20