International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : TSB : Circulars : 46 Recently posted -  Search Meeting Documents
   
[46]  Meeting of Study Group 2 with a view to approving draft revised Rec. ITU-T E.129, draft new Recs ITU-T E.101, E.157, E.1000, draft new amendments to existing Recs ITU-T E.161.1, E.190, E.191, E.191.1, E.195, and draft new Annex G to existing Rec. ITU-T E.212, in accordance with the provisions of Res.1, Sect.9, of WTSA (Johannesburg, 2008) - Geneva, 24 November 2009

Format

Size

Posted

English

Word  

172544 bytes 2009-06-15 [46] Corrigendum 1

Word  

197120 bytes 2009-06-12 [46] 
Arabic

Word  

77312 bytes 2009-06-19 [46] 
Chinese

Word  

90112 bytes 2009-06-19 [46] 
Español

Word  

452608 bytes 2009-06-19 [46] 
Français

Word  

457216 bytes 2009-06-19 [46] 
Russian

Word  

108544 bytes 2009-06-19 [46] 
 

Document :

ITU-T TSB  (Study Period 2009)  Circular  46

Title :

Meeting of Study Group 2 with a view to approving draft revised Rec. ITU-T E.129, draft new Recs ITU-T E.101, E.157, E.1000, draft new amendments to existing Recs ITU-T E.161.1, E.190, E.191, E.191.1, E.195, and draft new Annex G to existing Rec. ITU-T E.212, in accordance with the provisions of Res.1, Sect.9, of WTSA (Johannesburg, 2008) - Geneva, 24 November 2009

Date :

2009-06-12

Source :

SG 2

Destination Groups :

SG02

Observation :

The corrigendum applies to the English version only.

Access :

Public Document

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2010-05-24