International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 16 : Meeting 2009-07-10 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG 16  TD (2009-07-10) 

ITU-T SG 16

Multimedia terminals, systems and applications

Study Period 2009

Meeting  from 2009-07-10 to 2009-07-10

held in Switzerland [Geneva]

Other Meetings : 2012-04-30  2011-11-21  2011-03-14  2010-07-19  2009-10-26  [ 2009-07-10 ]  2009-06-26  2009-01-27 

Results:25 total items.
Temporary Documents  (WP3)   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 67-WP3 ]  
(Rev.1) 
Draft new G.711 Amendment 1 "Pulse code modulation (PCM) of voice frequencies: new Annex A 'Lossless encoding of PCM frames" (for Consent)     Editor G.711 Amd.1   Q10/16   2009-07-10
[ 66-WP3 ]  
(Rev.1) 
Liaison statements produced by Q6/16     Rapporteur Q6/16   Q6/16   2009-07-10
[ 65-WP3 ]  
 
Draft "Request for Video Test Sequences for Enhanced Performance Video Coding" Work (for approval)     Rapporteur Q6/16   Q6/16   2009-07-10
[ 64-WP3 ]  
(Rev.1) +Add.1-2 
Draft new ITU-T G.711.0 (ex G.711-LLC) "Lossless compression of G.711 pulse code modulation" (for Consent)     Editor G.711-LLC   Q10/16   2009-07-10
[ 63-WP3 ]  
 
Draft LSs from WP3/16 to IETF and to ETSI DECT, HGI     Chairman WP3/16   Q10/16, Q9/16, Q8/16, Q7/16, Q6/16   2009-07-09
[ 62-WP3 ]  
(Rev.1) 
LSs from Q10/16     Rapporteurs Q10/16   Q10/16   2009-07-09
[ 61-WP3 ]  
 
Draft Processing Test Plan for ITU-T G.711 post-processing module     Rapporteurs Q10/16   Q10/16   2009-07-09
[ 60-WP3 ]  
 
Preparation of the STL Release 2009     Rapporteurs Q10/16   Q10/16   2009-07-09
[ 59-WP3 ]  
 
Processing Test Plan for the for the ITU-T Joint (G.718/G.729.1) SWB/Stereo extension Optimisation/Characterization phase     Rapporteurs Q10/16   Q10/16   2009-07-09
[ 58-WP3 ]  
 
ITU-T characterization phase of the superwideband extension (SWB) to ITU-T G.722/G.711.1: List of conditions and stereo scenarios     Rapporteurs Q10/16   Q10/16   2009-07-09
[ 57-WP3 ]  
+Add.1 
Draft new ITU-T Rec.G.729.1 Corrigendum 1 "G.729-based embedded variable bit-rate coder: An 8-32 kbit/s scalable wideband coder bitstream interoperable with G.729: Corrections to source code" (for Consent)     Editor G.729.1   Q10/16   2009-07-09
[ 56-WP3 ]  
 
Draft new Corrigendum 2 to Recommendation ITU-T G.718 (for Consent)     Editor G.718   Q9/16   2009-07-09
[ 55-WP3 ]  
 
Draft revised Technical Paper HSTP-MCTB (ex HSTP-MCTA) "Media coding toolbox for IPTV: Audio and video codecs" (for Approval)     Rapporteur Q6/16   Q6/16   2009-07-09
[ 54-WP3 ]  
(Rev.1) 
LS prepared by Q8/16 at its meeting in Geneva, 6-9 July 2009     Rapporteur Q8/16   Q8/16   2009-07-09
[ 53-WP3 ]  
 
Processing plan (V1.0) for GSAD selection phase     Rapporteur Q8/16   Q8/16   2009-07-09
[ 52-WP3 ]  
 
Performance evaluation plan (V1.0) for GSAD selection phase     Rapporteur Q8/16   Q8/16   2009-07-09
[ 51-WP3 ]  
 
Draft Terms of Reference of the Enhanced Performance Video Coding Joint Collaborative Team (EPVC JCT)     Rapporteur Q6/16   Q6/16   2009-07-09
[ 50-WP3 ]  
 
List of IPR information received between February and July 2009 for ITU-T WP3/16 Recommendations     TSB   Q10/16, Q9/16, Q8/16, Q7/16, Q6/16   2009-07-09
[ 49-WP3 ]  
 
List of Participants     TSB   Q10/16, Q9/16, Q8/16, Q7/16, Q6/16   2009-07-06
[ 48-WP3 ]  
(Rev.1) 
Report of Q10/16 Rapp. Group meeting (Geneva, 6-9 July 2009)     Rapporteurs Q10/16   Q10/16   2009-07-06
[ 47-WP3 ]  
(Rev.1) +Add.1 
Report of Q9/16 Rapp. Group meeting (Geneva, 6-9 July 2009)     Rapporteur Q9/16   Q9/16   2009-07-06
[ 46-WP3 ]  
(Rev.1) +Add.1 
Report of Q8/16 Rapp.Group meeting (Geneva, 6-9 July 2009)     Rapporteur Q8/16   Q8/16   2009-07-06
[ 45-WP3 ]  
(Rev.1) 
Report of Q6/16 Rapp. Group meeting (London and Geneva, 1-3 and 6-8 July 2009)     Rapporteur Q6/16   Q6/16   2009-07-06
[ 44-WP3 ]  
 
Report of Q6/16 Rapp. Group meeting (Yokohama, Japan, 15-18 April 2009)     Rapporteur Q6/16   Q6/16   2009-07-06
[ 43-WP3 ]  
 
Draft agenda and work plan for WP 3/16 (Geneva, 10 July 2009)     Chairman WP 3/16   Q9/16, Q8/16, Q7/16, Q6/16, Q10/16   2009-04-17
Results:25 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2009-07-10