International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 2390 ]  
 
Optic Fiber networks in Burundi     Burundi   QALL/15   2012-08-29
[ 2389 ]  
 
Implementation of L2.bis modes in ADSL2Plus     British Telecommunications Public Ltd. Co. (BT Plc)   Q4A/15   2012-08-29
[ 2388 ]  
 
Proposal of study items for multi-layer/multi-technology converged transport networks     NTT   Q9/15, Q14/15, Q12/15, Q10/15   2012-08-29
[ 2387 ]  
 
Proposal of clarification of requirements for MPLS-TP p2mp transport path     NTT   Q9/15, Q3/15, Q14/15, Q12/15, Q10/15   2012-08-29
[ 2386 ]  
 
10 G signal transmission in seeded DWDM system     LG-Ericsson   Q6/15   2012-08-29
[ 2385 ]  
 
Comparison of proposed low cost DWDM system     LG-Ericsson   Q6/15   2012-08-29
[ 2384 ]  
(Rev.1) 
Boundary clock in networks and simulations     Tellabs Oy   Q13/15   2012-08-28
[ 2383 ]  
(Rev.1) 
Boundary clock simulation model     Tellabs Oy   Q13/15   2012-08-28
[ 2382 ]  
 
Not used  
Duplicate of C-2383
 
N/A     2012-08-28
[ 2381 ]  
(Rev.1) 
G.8265.1 supported duration of negotiated service     Tellabs Oy   Q13/15   2012-08-28
[ 2380 ]  
 
G.fast: Minimum Duration of Transmission Opportunity     Huawei Technologies Co. Ltd.   Q4A/15   2012-08-28
[ 2379 ]  
 
G.hn: Adding pre-defined BATs with bit loading up to 30MHz for an Amendment to G.9960     Sigma Designs Israel S.D.I Ltd.   Q4B/15   2012-08-28
[ 2378 ]  
 
Reversion fails at simultaneous clear SFs in PSC based MPLS-TP linear protection     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2012-08-28
[ 2377 ]  
 
G.fast: Per-Frame MAP     Sckipio Technologies S.I. Ltd.   Q4A/15   2012-08-28
[ 2376 ]  
 
Proposal for determined Amendment 1 of G.9955 main body : EVM Evaluation     Yitran Communications Ltd.   Q4C/15   2012-08-28
[ 2375 ]  
 
Cooperation of G.781 and BMCA in telecom profile for time     Nokia Siemens Networks GmbH & Co. KG   Q13/15   2012-08-28
[ 2374 ]  
 
PDV test pattern for G.8263     Nokia Siemens Networks GmbH & Co. KG   Q13/15   2012-08-28
[ 2373 ]  
 
Proposal for G.epon specific managed entities     Mitsubishi Electric Corporation , OKI Electric Industry Company Ltd. (OKI)   Q2/15   2012-08-28
[ 2372 ]  
 
Proposal for G.epon related managed entities     Mitsubishi Electric Corporation , OKI Electric Industry Company Ltd. (OKI)   Q2/15   2012-08-28
[ 2371 ]  
 
Incorporation of agreed changes in G.8121.2     Cisco Systems, Inc.   Q9/15   2012-08-28
[ 2370 ]  
 
Comparison of protection interworking architectures using distributed G.8031     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2012-08-28
[ 2369 ]  
 
Coordination of G.698.2-related work within SG15     Deutsche Telekom AG   Q6/15   2012-08-28
[ 2368 ]  
 
Low-complexity DWDM system with self-seeded optical transceivers     Futurewei Technologies US R&D Center   Q6/15, Q2/15, Q12/15   2012-08-28
[ 2367 ]  
 
Proposal of inter-OLT communication in G.multi     Futurewei Technologies US R&D Center   Q2/15   2012-08-28
[ 2366 ]  
 
Definition of the "Tx power difference between polarizations" for G.698.2     Deutsche Telekom AG   Q6/15   2012-08-28
[ 2365 ]  
 
Discussion on G.poc upstream transmission     Futurewei Technologies US R&D Center   Q4A/15, Q2/15, Q1/15   2012-08-28
[ 2364 ]  
 
Comments on draft revised Recommendation G.872     Deutsche Telekom AG   Q12/15   2012-08-28
[ 2363 ]  
 
2.5G upstream GPON discussion     Futurewei Technologies US R&D Center   Q2/15   2012-08-28
[ 2362 ]  
 
Scope of G.8275.1     France Télécom Orange   Q13/15   2012-08-28
[ 2361 ]  
 
Review of G.8272 latest draft     France Télécom Orange   Q13/15   2012-08-28
[ 2360 ]  
 
G.8272: New Appendix describing possible PRTC locations     France Télécom Orange   Q13/15   2012-08-28
[ 2359 ]  
 
Results of PDV tolerance testing using sinusoidal patterns as defined in G.8263-Testing     France Télécom Orange   Q13/15   2012-08-28
[ 2358 ]  
 
G.8263: revised text for Appendix II dealing with Packet Delay Variation Noise Tolerance testing     France Télécom Orange   Q13/15   2012-08-28
[ 2357 ]  
 
Development of a new Appendix of G.8261.1 on PDV generation testing     France Télécom Orange   Q13/15   2012-08-28
[ 2356 ]  
 
G.fast: Dynamic BW allocation     Sckipio Technologies S.I. Ltd.   Q4A/15   2012-08-28
[ 2355 ]  
 
G.fast: Low Complexity FFT/IFFT Scheme     Telefon AB - LM Ericsson   Q4A/15   2012-08-28
[ 2354 ]  
 
G.fast: New cable model for wiring type B05a, CAD55     Telefon AB - LM Ericsson   Q4A/15   2012-08-28
[ 2353 ]  
 
G.fast: Are you willing to give up 6dB of performance gain???     Sckipio Technologies S.I. Ltd.   Q4A/15   2012-08-28
[ 2352 ]  
 
G.fast: Updated measurements and modelling of CAD55 cable     Telefon AB - LM Ericsson   Q4A/15   2012-08-28
[ 2351 ]  
 
Scope of Q2, as applies to access vs. OTN     British Telecommunications Public Ltd. Co. (BT Plc) , China Telecommunications Corporation , Futurewei Technologies US R&D Center , Nippon Telegraph and Telephone Corporation (NTT)   Q6/15, Q2/15, Q12/15   2012-08-28
[ 2350 ]  
 
G.fast: On the adaptation of the G.998.4 DTU format to G.fast     Sckipio Technologies S.I. Ltd.   Q4A/15   2012-08-28
[ 2349 ]  
(Rev.1) 
Modulation format for 100G in G.698.2     Deutsche Telekom AG   Q6/15   2012-08-28
[ 2348 ]  
 
G.fast: Principle Operations Of Layered Modulation     Alcatel-Lucent Bell N.V.   Q4A/15   2012-08-28
[ 2347 ]  
 
G.gen: VDSL: G.ploam: Corrigendum on "INPMIN-ROC"     Alcatel-Lucent Bell N.V.   Q4A/15   2012-08-28
[ 2346 ]  
 
VDSL: Amendment of Receiver Initiated SRA following an SOS procedure     Alcatel-Lucent Bell N.V.   Q4A/15   2012-08-28
[ 2345 ]  
 
G.gen: VDSL: G.ploam: Reporting parameter "Actual AELE-MODE"     Alcatel-Lucent Bell N.V.   Q4A/15   2012-08-28
[ 2344 ]  
 
Consequence of floor delay changes under tight PLL bandwidth     RAD Data Communications, Ltd.   Q13/15   2012-08-28
[ 2343 ]  
 
The TVL of Signaling message     Huawei Technologies Co. Ltd.   Q13/15   2012-08-28
[ 2342 ]  
 
Proposal to finalize a Recommendation specifying APS based MPLS-TP linear protection for PTN applications     Italy   Q9/15, Q14/15, Q10/15   2012-08-28
[ 2341 ]  
 
The effect of MAC control pause operation for PTP synchronization     Huawei Technologies Co. Ltd.   Q13/15   2012-08-28
Results:2390 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2021-01-29