International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG15  ALL (2008-12-01) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2008-12-01 to 2008-12-12

held in Switzerland [Geneva]

Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 338 ]  
 
2008-11-28 Alcatel-Lucent, AimValley BV   G.8032 SF and FS     Q9/15  
[ 337 ]  
 
2008-11-28 Alcatel-Lucent Bell N.V.   G.lt: Update to SELT-PMD draft text     Q4/15  
[ 336 ]  
 
2008-11-26 Huawei Technologies Co.,Ltd.   G.984.4 Implementer's Guide     Q2/15  
[ 335 ]  
 
2008-11-26 Huawei Technologies Co., Ltd.   Signal Degrade (SD) triggered protection switching     Q9/15  
[ 334 ]  
 
2008-11-26 Huawei Technologies Co., Ltd.   Proposal on the link recovery in case of multiple failures in G.8032     Q9/15  
Currently viewing 5 of 338  documents related to this meeting (more...)  

 
Temporary Documents  Documents / Contributions
 
Number 
Received Source Title Questions
[ 56-GEN ]  
 
2008-12-08 Rapporteur Q2/15   Discussion and next steps of phase/time synchronization in G-PON     Q13/15, Q2/15  
[ 55-GEN ]  
(Rev.1-2) 
2008-12-02 TSB   Final list of participants     QALL/15  
[ 54-GEN ]  
 
2008-12-01 Rapporteur Q12/15   Work on Wavelength Switched Optical Networks     Q12/15, Q6/15  
[ 53-GEN ]  
(Rev.1) 
2008-12-01 Rapporteur Q3/15   Draft agenda for joint Question sessions on Optical Transport Networks (OTN) Coordination     Q14/15, Q13/15, Q12/15, Q11/15, Q10/15, Q9/15, Q7/15, Q6/15, Q3/15  
[ 52-GEN ]  
 
2008-12-01 Chairman FG ICT&CC   Questionnaire from ITU-T Focus Group on ICT and Climate Change     QALL/15  
Currently viewing 5 of 429  documents related to this meeting (more...)  

 
Reports  Documents / Contributions
 
Number 
Received Source Title Questions
[ 4 ]  
 
2009-03-05 SG 15   Report of the first meeting of Working Party 3/15, Transport network structures (2009-2012) (Geneva, 1 - 12 December 2008)     Q9/15, Q3/15, Q15/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15  
[ 3 ]  
 
2009-03-13 SG 15   Report of the first meeting of Working Party 2/15 Optical access/transport network technologies and physical infrastructures (2009-2012), (Geneva, 1 - 12 December 2008)     Q8/15, Q7/15, Q6/15, Q5/15, Q19/15, Q18/15, Q17/15, Q16/15  
[ 2 ]  
 
2009-02-27 SG 15   Report of the first meeting of Working Party 1/15, Transport aspects of Access networks and home networking (2009-2012), (Geneva, 1-12 December 2008)     Q4/15, Q2/15, Q1/15  
[ 1 ]  
 
2009-02-19 SG 15   Report of the first meeting of Study Group 15, Optical transport networks and access network infrastructures, (Geneva, 1-12 December 2008)     Q1-19/15  
 

 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2014-7-30