International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG11 : Meeting Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG11  ALL (2005-09-05) 

ITU-T SG11

Session, bearer and resource control; Attachment control, testing and handbook

Study Period 2005

Meeting  from 2005-09-05 to 2005-09-09

held in Switzerland [Geneva]

Collective Letters  Documents / Contributions
 
Number 
Received Source Title Questions
[ 3 ]  
 
2005-05-23 SG 11   Meeting of Study Group 11 (Geneva, 5-9 September 2005)     N/A  
 

 
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 3 ]  
 
2005-07-11 Germany   Traditional Approval Procedure for IEPS Phase 2 Matters     Q4/11, Q3/11  
 

 
Delayed Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 68 ]  
 
2005-08-24 Germany   IEPS: Location of Priority Mapping     4/11, 3/11  
[ 67 ]  
 
2005-08-24 United States of America   Proposed IP-NNI Signalling Profile Recommendation     4/11, 3/11  
[ 66 ]  
 
2005-08-24 People's Republic of China   Proposed initial draft for TR-RACF Re Stage 3     5/11  
[ 65 ]  
 
2005-08-24 People's Republic of China   Proposed change to Q.rcp.cci     5/11  
[ 64 ]  
 
2005-08-24 People's Republic of China   Proposed initial draft for TR-RACF Rc Stage 3     5/11  
Currently viewing 5 of 19  documents related to this meeting (more...)  

 
Temporary Documents  Documents / Contributions
 
Number 
Received Source Title Questions
[ 218-GEN ]  
 
2005-09-08 TSB   Final List of Participants     ALL/11  
[ 217-GEN ]  
 
2005-09-08 ITU-T SG 11 (Q3/11)   Response to SG 16 regarding G.769 future expansion for NGN     15/16, 3/11  
[ 216-GEN ]  
 
2005-09-08 ITU-T SG 11 (Q3/11)   Response to SG 16 regarding V.15x-series applicability to PSTN/ISDN emulation/simulation services     11/16, 3/11  
[ 215-GEN ]  
(Rev.1) 
2005-09-08 Q.5/11 Rapporteur (Ms. Tina Tsou)   Q.5/11 Meeting Report     5/11  
[ 214-GEN ]  
 
2005-09-08 Q3/11 Rapporteur (Mr. Rainer Münch)   Q3/11 Report     3/11  
Currently viewing 5 of 86  documents related to this meeting (more...)  

 
Reports  Documents / Contributions
 
Number 
Received Source Title Questions
[ 13 ]  
 
2005-09-20 SG 11   Report of the meeting held in Geneva from 5 to 9 September 2005 - Part II : Draft Amendments to existing Recommendations determined at the SG 11 Plenary on 9 September 2005 for consideration of approval process at the next meeting of Study Group 11 (Traditional Approval Process, WTSA-04)     Q4/11  
[ 12 ]  
 
2005-09-26 SG 11   Report of the Meeting of Working Party 3/11 (Geneva, 5 - 9 September 2005)     Q8/11, Q7/11, Q6/11  
[ 11 ]  
 
2005-09-26 SG 11   Report of the Meeting of Working Party 2/11 (Geneva, 5 - 9 September 2005)     Q5/11, Q4/11, Q3/11  
[ 10 ]  
 
2005-09-26 SG 11   Report of the Meeting of Working Party 1/11 (Geneva, 5 - 9 September 2005)     Q2/11, Q1/11  
[ 9 ]  
 
2005-09-26 SG 11   Report of the Meeting of Study Group 11 (Geneva, 5 - 9 September 2005)     QALL/11  
 

 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2013-5-24