International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG17 : WP C/17 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG17  D (2004-07-19) 

ITU-T SG17

Data Networks and Telecommunication Software

Study Period 2001

WP C/17

held in Switzerland [Geneva]

Other Meetings : 2004-10-01  [ WP C/17 ]  2004-03-10  2003-09-10  2002-11-20  2002-02-27 

Results:5 total items.
Delayed Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 152 ]  
 
2004-07-12 Q.N/17 Rapporteur   Draft Corrigendum to ITU-T Recommendation Z.100     QN/17  
[ 151 ]  
 
2004-07-08 Q.N/17 Rapporteur   Draft ITU-T Recommendation Z.104 - Encoding of SDL data     QN/17  
[ 150 ]  
 
2004-07-07 Deutsche Telekom   Considerations on telecom modelling languages     QALL/17  
[ 149 ]  
 
2004-07-01 Republic of Korea   Response on "Generic approach to interoperability testing"     QQ/17  
[ 148 ]  
 
2004-07-01 Republic of Korea   The final draft for "Z.itfm: Interoperability testing framework and methodology"     QQ/17  
Results:5 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2004-07-02