International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2003-10-21 : Reports  Recently posted -  Search Meeting Documents
   
ITU-T SG15  R (2003-10-21) 

ITU-T SG15

Optical and other transport networks

Study Period 2001

Meeting  from 2003-10-21 to 2003-10-31

held in Switzerland [Geneva]

Other Meetings : 2004-04-19  2003-01-20  2002-04-29  2001-10-15  2001-02-05 

Results:11 total items.
Reports  Documents / Contributions
 
Number 
Received Source Title Questions
[ 55 ]  
 
2003-11-11 SG 15   Report of Working Party 5/15 - Project and Promotion (Geneva, 21-31 October 2003) - Part I.3: OTN Standardization Plan (issue 4)     Q19/15, Q1/15  
[ 54 ]  
 
2003-11-11 SG 15   Report of Working Party 5/15 - Projects and Promotion (Geneva, 21-31 October 2003) - Part I.2: ANT Standardization Plan (issue 8) and Work Plan (issue 7)     Q19/15, Q1/15  
[ 53 ]  
 
2004-01-16 SG 15   Report of Working Party 5/15 - Projects and promotion (Geneva, 21-31 October 2003) - Part I: General     Q19/15, Q1/15  
[ 52 ]  
 
2004-01-19 SG 15   Report of Working Party 4/15 - OTN Technology (Geneva, 21-31 October 2003) - Part I: General     Q18/15, Q17/15, Q16/15, Q15/15  
[ 51 ]  
 
2003-11-11 SG 15   Report of Working Party 3/15, OTN (Geneva, 21-31 October 2003) - Part II-A: Stable texts for draft Recommendations G.798 and G.7041/Y.1303     QALL/15  
[ 50 ]  
 
2004-01-15 SG 15   Report of Working Party 3/15 - OTN structure (geneva, 21-31 October 2003) - Part I: General     Q14/15, Q13/15, Q12/15, Q11/15, Q10/15, Q9/15  
[ 49 ]  
 
2003-11-10 SG 15   Report of the 5th meeting of Study Group 15 - Transport networks, systems and equipment (Geneva, 21-31 October 2003) - Implementor's guide for Recommendation G.168     Q2/15  
[ 48 ]  
 
2004-01-14 SG 15   Report of Working Party 2/15 - Network signal processing (Geneva, 21-31 October 2003) - Part I: General     Q8/15, Q7/15, Q6/15, Q5/15  
[ 47 ]  
 
2003-11-10 SG 15   Report of the 5th meeting of Study Group 15 - Transport networks, systems and equipment (Geneva, 21-31 October 2003) - Implementor's guide for Recommendation G.983.1 B-PON     Q2/15  
[ 46 ]  
 
2004-01-14 SG 15   Report of Working Party 1/15 - Network Access (Geneva, 21-31 October 2003) - Part I: General     Q4/15, Q3/15, Q2/15  
[ 45 ]  
 
2004-01-21 SG 15   Report of the fifth meeting of Study Group 15 - Optical and other transport networks (Geneva, 21-31 October 2003) - General     QALL/15  
Results:11 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2014-8-30