International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : SG01 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R SG01  C 

ITU-R SG01

Spectrum Management

Results:233 total items.
Result page:  1 - 2 - 3 - 4 - 5  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 233 ]  
 
Report ITU-R BT.2470-0 - Use of Monte Carlo simulation to model interference to DTTB     SG 6     2019-10-10
[ 232 ]  
 
Liaison statement on the definition of broadband access     SCV     2019-08-26
[ 231 ]  
 
Liaison statement on results fo ITU's work on machine learning for 5G networks     ITU-T FG ML5G     2019-08-26
[ 230 ]  
 
Question ITU-R 228-3/3 - Propagation data required for the planning of radiocommunication systems operating above 275 GHz     SG 3     2019-08-22
[ 229 ]  
 
Liaison statement to CISPR (copy for infromation to Study Group 1 and Working Parties 1A, 5A, 5B and 7A) - Update to broadcasting services protection requirements in the CISPR radio sevices database     WP 6A   Q32/6   2019-07-29
[ 228 ]  
 
Liaison statement on the new version of the Home Network Transport (HNT) standards over view and work plan     ITU-T SG 15     2019-07-22
[ 227 ]  
 
Liaison statemen to TSAG, ITU-D Sector and ITU-R Sector on inter-Sector Coordination (reply to TSAG-LS 13, ITU-D SG1RGQ/120 (Rev.1)-E, ITU-D SG2RGQ/107 (Rev.1)-E and ITU-R SG 6-LS 28)     ITU-T SG 15     2019-07-22
[ 226 ]  
+Ann.1-2 
Summary Record of the meeting of Radiocommunication Study Group 1 (6 - 7 June 2019)     Chairman, SG 1     2019-06-12
[ 225 ]  
 
Final list of participants - Study Group 1 (Geneva, 6-7 June 2019)     Director, BR     2019-06-07
[ 224 ]  
 
List of documents issued (Documents 1/158 - 1/224)     BR Study Groups Department     2019-06-06
[ 223 ]  
 
Preliminary draft revision of ITU-R Resolutions     Chairman, SG 1     2019-06-05
[ 222 ]  
 
Executive Report on the May-June 2019 meeting of Working Party 1B (Geneva, 28 May - 5 June 2019)     Chairman, WP 1B     2019-06-05
[ 221 ]  
 
Executive Report on the November 2018 meeting of Working Party 1B (Geneva, 16-20 November 2018)     Chairman, WP 1B     2019-06-05
[ 220 ]  
 
Executive Report on the May-June 2019 meeting of Working Party 1C (Geneva, 28 May - 5 June 2019)     Chairman, WP 1C     2019-06-05
[ 219 ]  
(Rev.1) 
Executive Report on the May-June 2019 meeting of Working Party 1A (Geneva, 28 May - 5 June 2019)     Chairman, WP 1A     2019-06-05
[ 218 ]  
 
Draft reply liaison statement from ITU-R Study Group 1 to CISPR (copy to ITU-R Working Parties 5A, 5B, 6A and 7A) - Establishment of Liaison between CISPR-B and the relevant groups in ITU-R     WP 1A     2019-06-05
[ 217 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SM.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems     WP 1A     2019-06-05
[ 216 ]  
(Rev.1) 
Draft new Recommendation ITU-R SM.[WPT_MOBILE] - Guidance on frequency ranges for operation of non-beam wireless power transmission systems for mobile and portable devices     WP 1A     2019-06-05
[ 215 ]  
(Rev.1) 
Revision to Report ITU-R SM.2422-0 - Visible light for broadband communications     WP 1A     2019-06-05
[ 214 ]  
(Rev.1) 
New Report ITU-R SM.2451-0 (WPT_EV_IMPACT) - Assessment of impact of wireless power transmission for electric vehicle charging (WPT-EV) on radiocommunication services     WP 1B     2019-06-05
[ 213 ]  
 
Draft reply liaison statement from ITU-R Study Group 1 to ITU-T Study Group 3 (copy to the Director of the Radiocommunciation Bureau for communication to the Director of the Telecommunication Standardization Bureau) (copy to ITU-R Working Parties 5A and 5D for information) - Comments on draft new Recommendation ITU-T D.264 (D.SpectrumShare)     WP 1B     2019-06-05
[ 212 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SM.1875-2 - DVB-T/T2 coverage measurements and comparison with coverage predictions     WP 1C     2019-06-05
[ 211 ]  
(Rev.1) 
Revision of Report ITU-R SM.2257-4 - Spectrum management and monitoring during major events     WP 1C     2019-06-05
[ 210 ]  
(Rev.1) 
New Report ITU-R SM.2454-0 (MEAS-GNSS) - Spectrum monitoring techniques in the RNSS frequency bands     WP 1C     2019-06-05
[ 209 ]  
(Rev.1) 
New Report ITU-R SM.2453-0 (SAT MON COOPERATION) - Cooperation in the field of space radio monitoring     WP 1C     2019-06-05
[ 208 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SM.1054-0 - Monitoring of radio emissions from spacecraft at monitoring stations     WP 1C     2019-06-05
[ 207 ]  
(Rev.1) 
Revision of Report ITU-R SM.2355-0 - Spectrum monitoring evolution     WP 1C     2019-06-05
[ 206 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SM.1268-4 - Method of measuring the maximum frequency deviation of FM broadcast emissions at monitoring stations     WP 1C     2019-06-05
[ 205 ]  
(Rev.1) 
New Report ITU-R SM.2450-0 (275-450GHz_SHARING) - Sharing and compatibility studies between land-mobile, fixed and passive services in the frequency range 275-450 GHz     WP 1A   AI1.15   2019-06-05
[ 204 ]  
 
Editorial update of twenty nine Recommendations assigned to ITU-R Working Party 1A     WP 1A     2019-06-05
[ 203 ]  
 
Comments on format to the ITU-R Recommendations assigned to ITU-R Working Party 1A     WP 1A     2019-06-05
[ 202 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SM.1138-2 - Determination of necessary bandwidths including examples for their calculation and associated examples for the designation of emissions     WP 1A     2019-06-05
[ 201 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SM.1448-0 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz     WP 1A     2019-06-05
[ 200 ]  
 
Supplement on the maintenance of Recommendation ITU-R SM.1448     WP 1A     2019-06-05
[ 199 ]  
 
Draft Note from the Chairman of Study Group 1 to the Director of the Radiocommunication Bureau - Update on the inconsistencies in Appendix 7 (Rev.WRC-15) as listed in Annex 14 to Document 1A/340     WP 1A     2019-06-05
[ 198 ]  
(Rev.1) 
New Report ITU-R SM.2449-0 (WPT_100-148.5KHZ) - Technical characteristics and impact analyses of non-beam inductive Wireless Power Transmission (WPT) for mobile and portable devices charging on radiocommunication services     WP 1A   Q210/1   2019-06-05
[ 197 ]  
 
Preliminary draft of the Study Group 1 Chairman's Report to RA-19 - Spectrum management     Chairman, SG 1     2019-06-05
[ 196 ]  
(Rev.1) 
Revision of Report ITU-R SM.2182-2 - Measurement facilities available for the measurement of emissions from both GSO and non-GSO space stations     WP 1C     2019-06-04
[ 195 ]  
(Rev.1) 
Revision of Report ITU-R SM.2015-0 - Methods for determining national long-term strategies for spectrum utilization     WP 1B     2019-06-03
[ 194 ]  
 
Comments for mandatory format to the ITU-R Recommendations assigned to ITU-R Working Party 1C     WP 1C     2019-06-03
[ 193 ]  
 
Proposed editorial revision to the ITU-R Recommendations assigned to ITU-R Working Party 1B     WP 1B     2019-06-03
[ 192 ]  
(Rev.1) 
Draft new Question ITU-R [SPEC-AVAILABILITY]/1 - Methodologies for assessing or predicting spectrum availability     WP 1B     2019-06-03
[ 191 ]  
 
Draft reply liaison statement from ITU-R Study Group 1 to ITU-T Study Group 12 (copy to the Director of the Radiocommunication Bureau for communication to the Director of the Telecommuication Standardization Bureau) - Comments on Licensed Spectrum Sharing     WP 1B     2019-06-03
[ 190 ]  
(Rev.1) 
Revision to Report ITU-R SM.2153-6 - Technical and operating parameters and spectrum use for short-range radiocommunication devices     WP 1B     2019-06-03
[ 189 ]  
(Rev.1) 
New Report ITU-R SM.2452-0 (EMF-MON) - Electromagnetic field measurements to assess human exposure     WP 1C   Q239/1   2019-06-03
[ 188 ]  
 
Editorial update of twenty eight Recommendations assigned to ITU-R Working Party 1C     WP 1C     2019-06-03
[ 187 ]  
 
Report on CISPR activities from November 2018 to May 2019     Rapporteur, SG 1 RG on Liaison with CISPR     2019-05-27
[ 186 ]  
 
Establishment of liaison between CISPR B and the relevant Groups in ITU-R     International Special Committee on Radio Interference     2019-05-20
[ 185 ]  
 
Report of ITU-R Study Group 1 Correspondence Group on editorial review and maintenance ITU-R Recommendations, Reports and Questions assigned to the Study Group 1     Chairman, SG 1 CG on editorial review     2019-05-17
[ 184 ]  
 
Liaison statement on draft new Recommendation ITU-T D.264 on "Shared use of spectrum and telecommunication infrastructure as possible methods for enhancing the efficiency of telecommunications"     ITU-T SG 3     2019-05-10
Results:233 total items.
Result page:  1 - 2 - 3 - 4 - 5  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2019-10-23