International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5D : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5D  C 

ITU-R WP5D

IMT Systems

Results:850 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 850 ]  
 
2014-12-12 ITU-T SG 15   Liaison statement on consented revised Recommendation ITU-T G.9959     N/A  
[ 849 ]  
 
2014-12-10 Organization Meteorological Organization   Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 7B, 7C as responsible Groups for WRC-15 agenda item 1.1, 1.3, 1.5, 1.6, 1.9, 1.10, 1.11, 1.12, 1.17, 1.18, 7, 9.1.1, 9.1.2, 9.1.5, 9.1.6, 9.1.8, 10 (copy to Working Party 5D)     N/A  
[ 848 ]  
 
2014-12-09 Director, BR   Working document towards a preliminary draft new Report ITU-R M.[IMT.ARCH] - Architecture and topology of IMT networks     N/A  
[ 847 ]  
 
2014-11-28 WP 5C   Reply liaison statement to ITU-T Study Group 15, ITU-R Working Party 5D, MEF (copy to ITU-R Working Party 5A, 3GPP, BBF for information) - Work on draft new Report ITU-R F.[FS.IMT/BB]     N/A  
[ 846 ]  
 
2014-11-28 WP 5C   Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D - New Report ITU-R F.2323 - Fixed service use and future     N/A  
[ 845 ]  
 
2014-11-14 Chairman, SG 5   Note to Chairman of Study Group 4 (copy for information to Working Parties 4C and 5D) - Revision of Recommendation ITU-R M.1036-4     N/A  
[ 844 ]  
 
2014-11-14 SG 5   Liaison statement to Study Group 6 (copy to Working Party 5D) - Preliminary draft new Recommendation ITU-R M.[BSMS700]     N/A  
[ 843 ]  
 
2014-11-10 WP 5B   Liaison statement to Working Party 1B (copied for information to Working Parties 5A, 5C & 5D) - Liaison statement on the development of a working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS]     N/A  
[ 842 ]  
 
2014-11-10 WP 5C   Liaison statement to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D - Preliminary draft revision of Recommendation ITU-R F.758-5 - Systems parameters and considerations in the development of criteria for sharing or compatibility between digital fixed wireless systems in the fixed service and systems in other services and other sources of interference     N/A  
[ 841 ]  
 
2014-11-10 WP 5A   Liaison statement to Working Party 1A (copy for information to Workign Parties 1B, 1C, 4A, 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communications systems     N/A  
[ 840 ]  
 
2014-11-10 WPs 5A and 5C   Liaison statement to Working Party 1B on development of a draft new Report ITU-R SM.[DYNAMIC ACCESS] (copy for information to Working Parties 1A, 5B and 5D) - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities     N/A  
[ 839 ]  
 
2014-11-07 WP 5A   Liaison statement to Working Party 5D - Preliminary draft new Report ITU-R M.[PPDR] "Public protection and disaster relief communications" and draft revision of Recommendation ITU-R M.2009     N/A  
[ 838 ]  
 
2014-10-26 Israel (State of)   RF Human hazards - Intersectoral activities     N/A  
[ 837 ]  
 
2014-10-23 International Maritime Organization   Report of the tenth meeting of the Joint IMO/ITU Experts Group on maritime radiocommunication matters     N/A  
[ 836 ]  
+Ch.1-7 
2014-10-22 Chairman, WP 5D   Report on the twentieth meeting of Working Party 5D (Geneva, 15-22 October 2014)     N/A  
[ 835 ]  
 
2014-10-22 Director, BR   Final List of Participants - Working Party 5D (Geneva, 15-22 October 2014)     N/A  
[ 834 ]  
 
2014-10-16 Region 1 Rapporteur   Update on recent IMT related activities within ATU     N/A  
[ 833 ]  
 
2014-10-16 WP 7B   Liaison statement to Working Party 3M (for action) and Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D (for information)     N/A  
[ 832 ]  
 
2014-10-16 BR Study Groups Department   This document has not been assigned     N/A  
[ 831 ]  
 
2014-10-13 Region 3 Rapporteur   Activities related to IMT in Region 3     N/A  
[ 830 ]  
 
2014-10-11 Region 2 Rapporteur   Update on standards activities     N/A  
[ 829 ]  
 
2014-10-10 ITU Region 1 (CEPT) Rapporteur   Update on recent activities within CEPT     N/A  
[ 828 ]  
 
2014-10-10 CITEL Rapporteur   Update Report on CITEL PCC.II Activities     N/A  
[ 827 ]  
 
2014-10-08 Alcatel-Lucent International , Alcatel-Lucent USA Inc. , Ericsson Canada, Inc. , Nokia Corporation , Nokia Solutions and Networks Oy , NTT DoCoMo, Inc. , Telefon AB - LM Ericsson   Suggested modification to the view 1 on the detailed timeline and process for "IMT-2020"     N/A  
[ 826 ]  
 
2014-10-08 Telefon AB - LM Ericsson   Proposals concerning key capabilities and usage scenarios for preliminary draft new Recommendation ITU-R M.[IMT.VISION]     N/A  
Results:850 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2014-12-15