International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5C  C 

ITU-R WP5C

Fixed wireless systems; HF and other systems below 30 MHz in the fixed and land mobile services

Results:379 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 379 ]  
 
2015-05-28 WP 7B   Reply liaison statement to Working Party 5C - Revisions of Recommendations ITU-R F.1247-3, ITU-R F.1249-3 and ITU-R F.1509-2     N/A  
[ 378 ]  
 
2015-05-20 ITU-T SG 12   Liaison statement on development of draft new Question ITU-R [PERFORM]/5 - Performance and availability objectives and requirements for fixed wireless systems, including packet-based systems     N/A  
[ 377 ]  
 
2015-05-14 ITU-T SG 13   Liaison statement on new Question "Performance and availability objectives and requirements for fixed wireless systems, including packet-based systems"     N/A  
[ 376 ]  
 
2015-05-13 Chairman, SG 5   Results of the 22nd RAG meeting     N/A  
[ 375 ]  
 
2015-05-08 WP 3M   Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7A, 7B, 7C and 7D - Revision of Recommendation ITU-R P.619 - Propagation data required for the evaluation of interference between stations in space and those on the surface of the Earth     N/A  
[ 374 ]  
(Rev.1) 
2015-04-15 Chairman, SG 5   Progress of the studies requested by WRC Resolutions and Recommendations (except those directly related to WRC-15 agenda items)     N/A  
[ 373 ]  
 
2015-03-25 Institute of Electrical and Electronics Engineers, Inc.   Liaison statement on time sensitive networking for fronthaul     N/A  
[ 372 ]  
 
2015-03-03 WP 6A   Liaison statement to ITU-R Study Groups 1, 3, 4, 5 and 7, ITU-T Study Group 5 and ITU-D Study Groups 1 and 2 - Human exposure to RF fields from broadcast transmitters     N/A  
[ 371 ]  
 
2015-02-11 WP 5D   Liaison statement to Working Party 5C (copy to ITU-T Study Group 15 and MEF) - Architecture and topology of IMT networks     N/A  
[ 370 ]  
 
2015-02-10 WP 5D   Liaison statement to Working Party 1B (copy to WPs 5A, 5B and 5C for information) - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS]     N/A  
[ 369 ]  
 
2015-02-10 WP 5D   Liaison statement to ITU-T Study Group 13 and ITU-R Working Parties 4B and 5C (copy to ITU-D Study Groups 1 and 2) - Handbook on "Global trends in IMT"     N/A  
[ 368 ]  
 
2015-02-10 WP 5D   Liaison statement to WP 1A (copy for information to WPs 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems     N/A  
[ 367 ]  
 
2015-02-10 ITU-T SG 5   Liaison statement on Recommendations ITU-T K.60 - Coexistence of wired and wireless communication systems     N/A  
[ 366 ]  
 
2015-01-07 ITU-D Study Group 1 Rapporteur   Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R SG5 WP 5C on scope of work of Question 2/1     N/A  
[ 365 ]  
 
2014-12-12 ITU-T SG 15   Liaison statement on G.supp.Radio-over-Fiber     N/A  
[ 364 ]  
 
2014-12-10 WP 5B   Liaison statement to ITU-R Working Party 5C - WRC-15 agenda item 1.5     N/A  
[ 363 ]  
 
2014-12-01 WP 6A   Liaison statement to Working Party 5C (copied to Working Parties 4A, 4C, 5A, 7B and 7C) - Television broadcast receiving antenna pattern for use in sharing studies in the frequency range 470-862 MHz     N/A  
[ 362 ]  
 
2014-11-10 WP 5B   Liaison statement to ITU-T Study Groups 5, 9 & 15 and ITU-R Working Parties 1A & 3M (copy to for information ITU-R Working Parties 5A, 5C, 6A & 7D) - Co-existence between Radiocommunication systems and new wired telecommunications standards     N/A  
[ 361 ]  
 
2014-11-10 WP 5B   Liaison statement to Working Party 1B (copied for information to Working Parties 5A, 5C & 5D) - Liaison statement on the development of a working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS]     N/A  
[ 360 ]  
 
2014-11-10 WP 5A   Liaison statement to Working Party 1A (copy for information to Workign Parties 1B, 1C, 4A, 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communications systems     N/A  
[ 359 ]  
 
2014-11-05 WP 5B   Liaison statement to Working Parties 1C, 5A and 5C - Station call-sign identification to be used by oceanographic radar in frequency band 3 to 50 MHz     N/A  
[ 358 ]  
+Ann.1-10 
2014-11-05 Chairman, WP 5C   Report of the fourteenth meeting of Working Party 5C (Geneva, 27 October - 5 November 2014)     N/A  
[ 357 ]  
(Rev.2) 
2014-05-11 Director, BR   Final list of participants - Working Party 5C (Geneva, 27 October - 5 November 2014)     N/A  
[ 356 ]  
 
2014-11-04 WP 5A   Liaison statement to Working Parties 5B and 5C (copy for information to Workign Party 3L) - WRC-15 agenda item 1.4 - Status of studies for WRC-15 agenda item 1.4     N/A  
[ 355 ]  
 
2014-10-31 WP 5A   Liaison statement to ITU-R Working Party 5C - Preliminary draft new Report ITU-R F.[FS USE-TRENDS] - Fixed service use and future trends     N/A  
Results:379 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-05-28