International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5C  C 

ITU-R WP5C

Fixed wireless systems; HF and other systems below 30 MHz in the fixed and land mobile services

Results:437 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 437 ]  
 
2015-10-06 ITU-D SG 1   Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Study Group 5C on new Report ITU-R F.[FS.IMT/BB]     N/A  
[ 436 ]  
 
2015-08-26 WP 5A   Liaison statement to Working Party 4A (copied for information Working Parties 5C and 5D) - Working document towards a preliminary draft new Recommendation ITU-R SF.[INTERF.AREA]     N/A  
[ 435 ]  
 
2015-08-26 WP 5A   Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Working document toward a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED]     N/A  
[ 434 ]  
 
2015-08-26 WP 5A   Liaison statement to Working Parties 4A, 4C, 5B, 5C, 5D, 7B and 7D - On proposed revisions to Recommendation ITU-R M.1732     N/A  
[ 433 ]  
 
2015-08-26 WP 5A   Reply liaison statement to Working Party 1A - Copy for information to Working Party 5C, Working Party 7C and Working Party 7D - The land mobile service in the frequency range 275-1 000 GHz     N/A  
[ 432 ]  
 
2015-08-07 MEF   Liaison announcing second approved draft of MEF 22.2 Mobile Blackhaul (MBH) Implementation Agreement Phase 3     N/A  
[ 431 ]  
 
2015-08-03 WP 6A   Liaison statement to ITU-T SG 5 (Copied to ITU-R WP 3L, WP 1A, 1B, 5A, 5B, 5C, 5D, ITU-D SG 2 for information) - Human exposure to RF fields from broadcast transmitters - Comments to WHO monograph - radio frequency fields; environmental health criteria     N/A  
[ 430 ]  
 
2015-07-23 Chairman, SG 5   Note to Chairman of Study Group 4 on future activities (copy to Working Party 5C for information) - WRC-15 agenda items 1.8 and 1.10     N/A  
[ 429 ]  
 
2015-07-20 WP 5B   Reply liaison statement to Working Party 1A (copied for information to Working Parties 1B, 5A, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     N/A  
[ 428 ]  
+Ann.1-9 
2015-07-16 Chairman, WP 5C   Report on the fifteenth meeting of Working Party 5C (Bucharest, Romania, 6 - 15 July 2015)     N/A  
[ 427 ]  
 
2015-07-15 Director, BR   Final list of participants - Working Party 5C (Bucharest, Romania, 6-15 July 2015)     N/A  
[ 426 ]  
 
2015-07-14 ITU-T SG9   Liaison statement on radio frequency interference and co-existence between wired telecommunication and radiocommunication systems (reply to ITU-R WP 5B - 5B/TEMP/372)     N/A  
[ 425 ]  
 
2015-07-09 ITU-T SG 15   Reply liaison statement on development of a draft new Report ITU-R F.[FS.IMT/BB]: Fixed service backhaul networks for IMT and other terrestrial mobile broadband systems and architecture and topology of IMT networks     N/A  
[ 424 ]  
 
2015-07-06 ITU-T SG 15   Liaison statement on ITU-T SG15 OTNT Standardization work plan     N/A  
[ 423 ]  
 
2015-07-06 ITU-T SG 15   Liaison statement on development of draft new Question ITU-R [PERFORM]/5, "Performance and availability objectives and requirements for fixed wireless systems, including packet-based systems"     N/A  
[ 422 ]  
 
2015-07-03 WP 4A   Liaison statement to Working Parties 5A and 5C - Working document towards a preliminary draft new Recommendation ITU-R SF.[INTERF.AREA]     N/A  
[ 421 ]  
 
2015-07-03 WP 4A   Reply liaison statement to Working Parties 5C and 7B (copy for information to Working Party 5A) WRC-15 agenda item 1.9.1     N/A  
[ 420 ]  
 
2015-07-02 BR Study Groups Department   List of documents issued (Documents 5C/358 - 5C/420)     N/A  
[ 419 ]  
 
2015-07-01 WP 4A   Liaison statement to Working Party 5C (copy to Working Parties 4C, 5A, 5B, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.8     N/A  
[ 418 ]  
 
2015-07-01 WP 4A   Reply liaison statement to Working Party 5C - WRC-15 agenda item 1.6     N/A  
[ 417 ]  
 
2015-06-29 N/A   This document was sent to Working Party 5B only (Document 5B/862)     N/A  
[ 416 ]  
 
2015-06-29 Japan   Proposal of new work items to address the fixed service operating in the band 275-1 000 GHz and draft reply liaison statement to Working Party 1A     N/A  
[ 415 ]  
 
2015-06-29 Japan   Proposals on revisions of Recommendations ITU-R F.1247-3, F.1249-3 and F.1509-2     N/A  
[ 414 ]  
 
2015-06-29 Japan   Proposed modifications to and possible upgrade of preliminary draft new Recommendation ITU-R F.[FS DEPLOY] - Deployment scenarios for point-to-point systems in the fixed service     N/A  
[ 413 ]  
 
2015-06-29 Japan   Proposed modifications to working document towards a preliminary draft new Report ITU-R F.[FS.IMT/BB] - Use of fixed service for backhaul for IMT and other terrestrial mobile broadband systems     253/5, 247/5  
[ 412 ]  
 
2015-06-29 Japan   Draft elements for Working Party Chairman's Report to Study Group 5 - Progress of the studies requested by WRC Resolutions     N/A  
[ 411 ]  
 
2015-06-29 Japan   Review of the Questions assigned to Working Party 5C     N/A  
[ 410 ]  
 
2015-06-29 Japan   Draft revision of Question ITU-R 242-1/5 - Reference radiation patterns of omnidirectional and sectoral antennas in point-to-multipoint fixed wireless systems for use in sharing studies     N/A  
[ 409 ]  
 
2015-06-29 Australia   Revision of draft new Report ITU-R F.[ENGSHAREDEPLOYMENT] - Sharing and compatibility issues between electronic news gathering and other systems in frequency bands allocated to the fixed, mobile and broadcasting services     252/5  
[ 408 ]  
 
2015-06-29 Australia   Preliminary draft revision of Recommendation ITU-R F.1777 - System characteristics of television outside broadcast, electronic news gathering and electronic field production in the fixed service for use in sharing studies     N/A  
[ 407 ]  
 
2015-06-27 Robert Bosch GmbH   Working document towards a preliminary draft new Report ITU-R F.[FS/RLS COMPATIBILITY IN 71-86 GHZ] - Compatibility between the fixed service operating in the 71-76 GHz and 81-86 GHz bands and radio location service operating in the 76-77.5 GHz and 78-81 GHz bands     252/5  
[ 406 ]  
 
2015-06-26 France   Liaison statement to Working Party 5B - WRC-15 agenda item 1.5     N/A  
[ 405 ]  
 
2015-06-26 Indonesia (Republic of)   Monitoring and control band HF in Indonesia     N/A  
[ 404 ]  
 
2015-06-25 WP 5D   Liaison statement to Working Party 5C (copy to ITU-T Study Group 15, ITU-T FG IMT-2020, MEF and NGMN) - Architecture and topology of IMT networks     N/A  
[ 403 ]  
 
2015-06-25 United States of America   Framework for a Working Document toward a preliminary draft new Report on the use of high altitude platform stations for broadband in fixed service allocations     N/A  
[ 402 ]  
 
2015-06-25 United States of America   Proposed revision of Document 5C/358 Annex 1 "Preliminary draft new Recommendation ITU-R F.[FS DEPLOY]"     252/5  
[ 401 ]  
 
2015-06-24 United States of America   Proposed revisions to preliminary draft new Report ITU-R F.[FS.IMT/BB], "Use of fixed service for backhaul for IMT and other terrestrial mobile broadband systems"     N/A  
[ 400 ]  
 
2015-06-24 United States of America   Proposed draft reply liaison statement to Working Party 5B for WRC-15 agenda item 1.5 - Comments on the fixed service characteristics used in Annexes 4, 6 and 7     N/A  
[ 399 ]  
 
2015-06-24 WP 4C   Liaison statement to Working Party 5C - Recommendation aimed at assisting coordination between RDSS/MSS and the fixed service in the 2 483.5-2 500 MHz band     N/A  
[ 398 ]  
 
2015-06-23 WP 4C   Liaison statement to Working Parties 3M, 4A, 4B, 5A, 5B, 5C, 7A, 7B, 7C and 7D - WRC-15 agenda item 1.10     N/A  
[ 397 ]  
 
2015-06-22 China (People's Republic of)   Proposal to working document towards preliminary draft new Recommendation ITU-R F.[PERFORM] - Error performance and availability objectives and requirements for real point to point packet-based radio links     N/A  
[ 396 ]  
 
2015-06-22 China (People's Republic of)   Preliminary draft towards - Chapter 1 of Handbook on adaptive HF systems tutorial     N/A  
[ 395 ]  
 
2015-06-22 China (People's Republic of)   Supporting material for the development of [WORKING DOCUMENT TOWARDS A] preliminary draft new Question ITU-R F.[HF ENVIRONMENT] - Investigations on HF environment impact factors in HF sky-wave communications     N/A  
[ 394 ]  
 
2015-06-22 China (People's Republic of)   Proposed modifications to [WORKING DOCUMENT TOWARDS A] preliminary draft new Question ITU-R F.[HF ENVIRONMENT] - Technical and operational principles for HF sky-wave communication stations to improve the HF environment     N/A  
[ 393 ]  
 
2015-06-22 Germany (Federal Republic of)   Proposed amendments to Annex 6 to WD PDN Report ITU-R M.[UAS-FSS] - Annex 6 to WD PDN Report ITU-R M.[UAS-FSS] - Effects of emissions from incumbent services into earth stations on-board unmanned aircraft intended to communicate with a satellite network in frequency bands allocated to the fixed satellite service (link 2)     N/A  
[ 392 ]  
 
2015-06-22 Germany (Federal Republic of)   Proposal for the revision of Annex 2 to Report ITU-R M.[UAS-FSS] - Link performances analysis     N/A  
[ 391 ]  
 
2015-06-22 WP 1A   Liaison statement to Working Parties 1B, 5B, 5C, 6A, 7A and 7D - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     N/A  
[ 390 ]  
 
2015-06-22 WP 1A   Liaison statement to Working Parties 3K and 3M (copy for information to WPs 5A, 5C, 7C and 7D) - Technology trends of active services in the band above 275 GHz     N/A  
[ 389 ]  
 
2015-06-22 WP 1A   Liaison statement to the IEEE on the draft new Report ITU-R SM.[THZ_TREND] - Technology trends of active services in the band above 275 GHz     N/A  
[ 388 ]  
 
2015-06-22 WP 1A   Liaison statement to Working Parties 5A, 5C, 7C and 7D - Technology trends of active services in the band above 275 GHz     N/A  
Results:437 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-10-06