International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP4A Recently posted -  Search Meeting Documents
   
ITU-R WP4A Meeting Documents
  Max # of documents displayed/page:
Results: 64 total items.
Result Page:  1 - 2 - 3  - Next
Number  Date Source Title
  Number  Posted Size  
 
[ 672 ]  2015-07-23 WP 5B   Reply liaison statement to ITU-T Focues Group on aviation applications of cloud computing for flight data monitoring (copy to Working Party 4A, 4C ITU Inter-Sector Coordination Team)    
  [ 672 ]  - English -  Word 2010 2015-07-24 [13:47]  62'119  bytes  
 
[ 670 ]  2015-07-16 WP 5C   Reply liaison statement to Working Party 4C, Study Group 4 and Study Group 5 (with information to Working Parties 3M, 4A, 4B, 5A, 5B, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10    
  [ 670 ]  - English -  Word 2010 2015-07-16 [14:30]  60'608  bytes  
 
[ 671 ]  2015-07-16 WP 5C   Reply liaison statement to Working Party 4A, Study Group 4 and Study Group 5 - WRC-15 agenda item 1.8    
  [ 671 ]  - English -  Word 2010 2015-07-16 [14:28]  62'344  bytes  
 
[ 669 ]  2015-06-25 Chairman, WP 4A   Report on the meeting of Working Party 4A - (Geneva, 17 - 25 June 2015)    
  [ 669 ] Annex 16 - English -  Word 2010 2015-07-15 [09:23]  42'914  bytes List of liaison statements to ITU-R Groups  
  [ 669 ]  - English -  Word 2010 2015-07-14 [10:50]  110'750  bytes Report on the meeting of Working Party 4A (Geneva, 17-25 June 2015)  
  [ 669 ] Annex 15 - English -  Word 2010 2015-07-08 [08:23]  807'161  bytes Note to the Director, Radiocommunication Bureau - Clarifications to Section B3, Part B of the Rules of Procedure in the application of RR No. 11.32A- Rules concerning calculation methodology for calculating the probability of harmful interference between space networks  
  [ 669 ] Annex 13 - English -  Word 2010 2015-07-08 [08:11]  55'718  bytes Working document - Elements for future discussion and development related to WRC-15 agenda item 9.1, issue 9.1.2  
  [ 669 ] Annex 14 - English -  Word 2010 2015-07-08 [08:10]  61'857  bytes Note to the Director, Radiocommunication Bureau - Findings of the Bureau concerning satellite frequency assignments  
  [ 669 ] Annex 11 - English -  Word 2010 2015-07-08 [08:03]  57'558  bytes Working document towards a preliminary draft revision OF REPORT ITU-R S.2261 (ANNEX - [AIRBORNE] ESOMPS) - Guidelines that could be used by Administrations wishing to license [airborne] ESOMPs operating in non-GSO FSS systems in the frequency range 27-29.1 GHz while ensuring protection of terrestrial services  
  [ 669 ] Annex 10 - English -  Word 2010 2015-07-07 [16:13]  63'331  bytes Working document towards a preliminary draft revision of Report ITU-R S.2261 (ANNEX - ESOMPS ON VESSELS) - Guidelines that could be used by Administrations wishing to license ESOMPs mounted on vessels and operating in non-GSO FSS systems in the frequency range 27-29.1 GHz while ensuring protection of terrestrial services  
  [ 669 ] Annex 04 - English -  Word 2010 2015-07-06 [15:35]  524'823  bytes Preliminary draft new Report ITU-R S.[RES756] - Studies on possible reduction of the coordination arc and technical criteria used in application of RR No. 9.41 in respect of coordination under RR No. 9.7  
  [ 669 ] Annex 12 - English -  Word 2010 2015-07-06 [14:43]  1'185'260  bytes Working document - Use of linear polarization for Article 4 networks in Region 2  
  [ 669 ] Annex 09 - English -  Word 2010 2015-07-06 [11:55]  60'709  bytes Working document towards a preliminary draft new Report ITU-R S.[APP-1432] - Suggested guidelines on the application of Recommendation ITU-R S.1432  
  [ 669 ] Annex 03 - English -  Word 2010 2015-07-06 [11:41]  837'120  bytes Preliminary draft new Report ITU-R S.[FSS/BSS] - Review of the inter-regional sharing provisions contained in Annex 7 To RR Appendix 30  
  [ 669 ] Annex 08 - English -  Word 2010 2015-07-06 [10:30]  72'640  bytes Working document towards a preliminary draft new Recommendation ITU-R S.[FSS-MS SHARE METHODOLOGY] - Methodology for calculating separation distances for sharing in the 3 400-3 600 MHz range between earth stations of the fixed-satellite service and stations in the mobile service  
  [ 669 ] Annex 06 - English -  Word 2010 2015-07-06 [10:14]  1'197'728  bytes Preliminary draft revision of Report ITU-R S.2223 - Technical and operational requirements for GSO FSS earth stations on mobile platforms in bands from 17.3 to 30.0 GHz  
  [ 669 ] Annex 05 - English -  Word 2010 2015-07-03 [15:42]  85'246  bytes Preliminary draft revision of Report ITU-R BO.2019 - Interference calculation methods  
  [ 669 ] Annex 01 - English -  Word 2010 2015-07-03 [15:34]  172'400  bytes Preliminary draft new Recommendation ITU-R S.[FSS-REF_FOR_UA] - Technical and operational characteristics of Unmanned Aircraft Control and Non-Payload satellite communication links operated in certain frequency bands allocated to the fixed-satellite service not subject to RR Appendices 30, 30A and 30B  
  [ 669 ] Annex 07 - English -  Word 2010 2015-07-03 [13:38]  64'635  bytes Working document towards a preliminary draft new Recommendation ITU-R SF.[INTERF.AREA] - A methodology for providing compatibility between ubiquitously deployed earth stations of the fixed-satellite service and stations of the fixed and/or mobile services in adjacent areas for the cases described in the Tables of Appendix 7 of the Radio Regulations  
  [ 669 ] Annex 02 - English -  Word 2010 2015-07-03 [10:56]  16'723'974  bytes Preliminary draft new Report ITU-R S.[FSS 7/8 GHZ COMPATIBILITY] - Compatibility studies between the fixed-satellite service and the terrestrial and other space services in the frequency bands 7 150-7 250 MHz (space-to-Earth) and 8 400-8 500 MHz (Earth-to-space)  
 
[ 668 ]  2015-06-25 Director, BR   Final list of participants - Working Party 4A (Geneva, 17-25 June 2015)    
  [ 668 ]  - English -  PDF (acrobat) 2015-06-25 [14:17]  613'637  bytes  
 
[ ADM 48 ]  2015-06-25 Chairman, WP 4A   Agenda for the plenary meeting of Working Party 4A - Thursday, 25 June 2015, at 09:00 hours (Room C, ITU Tower)    
  [ ADM 48 ]  - English -  Word 2010 2015-06-25 [08:49]  54'893  bytes  
 
[ ADM 47 ]  2015-06-24 Chairman, WP 4A   Agenda for the Plenary Meeting of Working Party 4A - Wednesday, 24 June 2015, at 15:45 hours (Room C, ITU Tower)    
  [ ADM 47 ]  - English -  Word 2010 2015-06-24 [14:05]  54'075  bytes  
 
[ ADM 43 ]  2015-06-17 Chairman, WP 4A   Working structure of the meeting of Working Party 4A - Structure of Working Groups and document attribution (Documents 4A/8(Rev.3), 9(Rev.2), 541 and 4A/591 to 4A/667)    
  [ ADM 43 ] Revision 3 - English -  Word 2010 2015-06-24 [08:10]  50'256  bytes  
 
[ 667 ]  2015-06-23 WP 4C   Liaison statement to Working Parties 3M, 4A, 4B, 5A, 5B, 5C, 7A, 7B, 7C and 7D - WRC-15 agenda item 1.10    
  [ 667 ]  - English -  Word 2010 2015-06-23 [15:53]  52'534  bytes  
Results: 64 total items.
Result Page:  1 - 2 - 3  - Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages Yes  
Formats doc pdf zip  + Other formats
Languages (maximum 2) E F S A C R  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-07-24