Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP1C : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R WP1C  C 

UIT-R WP1C

Contrôle du Spectre

Resultats:174 documents
Résultats :  1 - 2 - 3 - 4  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Date Source Titre Questions
[ 174 ]  
 
2015-08-26 WP 5A   Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Working document toward a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED]     N/A  
[ 173 ]  
 
2015-08-03 WP 6A   Liaison statement to Working Party 1A (Copy to Working Parties 1B, 1C, 5B, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than a radio frequency beam     N/A  
[ 172 ]  
 
2015-07-14 ITU-T SG9   Liaison statement on radio frequency interference and co-existence between wired telecommunication and radiocommunication systems (reply to ITU-R WP 5B - 5B/TEMP/372)     N/A  
[ 171 ]  
 
2015-06-12 WP 1A   Liaison statement to ITU-T Study Group 5 (copy for information to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A, 7D and ITU-T Study Groups 9 and 15) - ITU-R interest in K-series Recommendations     N/A  
[ 170 ]  
 
2015-06-12 WP 1A   Liaison statement to Working Party 3L (copy to ITU-R Working Parties 1C, 4C, 5A, 5B, 5C, 5D, 6A, and 7D and to ITU-T Study Groups 5, 9, and 15) - Evaluating the leakage and impact of radio frequency noise from telecommunication systems using metallic conductors     N/A  
[ 169 ]  
+Ann.1-10 
2015-06-10 Chairman, WP 1C   Report of the meeting of Working Party 1C (Geneva, 3 - 10 June 2015)     N/A  
[ 168 ]  
(Rev.1) 
2015-06-09 Director, BR   Final list of participants - Working Party 1C (Geneva, 3-10 June 2015)     N/A  
[ 167 ]  
 
2015-06-02 BR Study Groups Department   List of documents issued (Documents 1C/119 - 1C/167)     N/A  
[ 166 ]  
 
2015-05-27 CG on DF Accuracy   Report of Correspondence Group Activity on preliminary draft new Recommendation ITU-R SM.[ Doc.XXX] - Proposal for a new Recommendation on alternative test procedure for measuring accuracy and immunity of direction finder using a simulator     N/A  
[ 165 ]  
 
2015-05-27 CG on DF Accuracy   Report of Correspondence Group Activity on preliminary draft new Recommendation ITU-R SM.[ON-SITE_DF_ACC] - On-site measurement of DF Accuracy     N/A  
[ 164 ]  
 
2015-05-27 Iran (Islamic Republic of)   Critical area for measuring and setting synchronization in medium frequency     N/A  
[ 163 ]  
 
2015-05-27 Japan   Proposed preliminary draft revision of Recommendation ITU-R SM.1753-2 - Methods for measurements of radio noise     N/A  
[ 162 ]  
 
2015-05-27 Japan   Proposal for a preliminary draft new Recommendation ITU-R SM.[Precision of time information in output data of monitoring receivers] - Precision of time information in output data of monitoring receivers     N/A  
[ 161 ]  
 
2015-05-27 Japan   Proposal for a preliminary draft new Recommendation on alternative test procedure for measuring accuracy and immunity of direction finder using a simulator     N/A  
[ 160 ]  
 
2015-05-27 Korea (Republic of)   Proposed revision to Report ITU-R SM.2130 - Inspection of radio stations     N/A  
[ 159 ]  
 
2015-05-22 China (People's Republic of)   Proposal on the modification of the working document toward a preliminary draft new Recommendation ITU-R SM.[ON-SITE_DF_ACC] - On-Site Measurements of DF Accuracy     N/A  
[ 158 ]  
 
2015-05-22 China (People's Republic of)   Proposed revisions to Recommendation ITU-R SM.1880 - Spectrum occupancy measurement     N/A  
[ 157 ]  
 
2015-05-22 Chairman, CG on Spectrum Monitoring Evolution   Working document towards a preliminary draft new Report ITU-R SM.[SPEC_MON_EVOLUTION] - Spectrum monitoring evolution     N/A  
[ 156 ]  
 
2015-05-22 China (People's Republic of)   Working document towards a preliminary draft new Report - Measurement techniques and new technologies for satellite monitoring     N/A  
[ 155 ]  
 
2015-05-22 China (People's Republic of)   Working document toward a preliminary draft new Recommendation ITU-R SM.[ON-SITE_DF_ACC] - On-site measurement of DF accuracy     N/A  
[ 154 ]  
 
2015-05-22 China (People's Republic of)   Proposed contribution to the working document towards a preliminary draft new Report ITU-R SM.[SPEC_MON_EVOLUTION] - The grid monitoring experimental network for metropolitan environment in Shanghai, China     N/A  
[ 153 ]  
 
2015-05-22 China (People's Republic of)   Proposal for a new Recommendation on test procedure for measuring direction finder sensitivity - Test procedure for measuring direction finder sensitivity     N/A  
[ 152 ]  
 
2015-05-22 Greece   Review of working document toward a preliminary draft new Recommendation ITU-R SM.[ON-SITE-DF-ACC] - On-site measurements of DF accuracy     N/A  
[ 151 ]  
 
2015-05-21 Israel (State of)   RF Human hazards - ITU Intersectoral activities     N/A  
[ 150 ]  
 
2015-05-20 Chairman CG on Planning SMN   Preliminary draft new Report ITU-R SM.[PLANNING_SMN] - Procedures for planning and optimization of spectrum-monitoring networks in the VHF/UHF frequency range     N/A  
[ 149 ]  
(Rev.1) 
2015-05-14 GEW Technologies (Pty) Ltd.   Comments on the working document toward a preliminary draft new Recommendation ITU-R SM.[ON-SITE_DF_ACC] - On-site measurements of DF accuracy     N/A  
[ 148 ]  
 
2015-05-14 MEDAV GmbH   Review of working document towards a preliminary draft new Recommendation ITU-R SM.[ON-SITE_DF_ACC] - On-site measurements of DF accuracy     N/A  
[ 147 ]  
 
2015-05-13 United States of America   Proposal for the revision of Recommendation ITU-R SM.1600 - Technical identification of digital signals     N/A  
[ 146 ]  
 
2015-05-08 Indonesia (Republic of)   Proposed modifications to Report ITU-R SM.2257-2 - Spectrum management and monitoring during major events     N/A  
[ 145 ]  
 
2015-04-30 GEW Technologies (Pty) Ltd.   Preliminary draft new Recommendation ITU-R SM.[DOC. _ _ _ _] - Inserting highly precise time information in I/Q data of monitoring receivers     N/A  
[ 144 ]  
 
2015-04-24 Brazil (Federative Republic of)   Report to Working Party 1C on the review of ITU-R Recommendations in the SM Series for the database on ITU-R Recommendations     N/A  
[ 143 ]  
 
2015-04-24 Brazil (Federative Republic of)   Spectrum management activities for the FIFA Soccer World Cup 2014 Brazil     N/A  
[ 142 ]  
 
2015-03-18 Ukraine   Working document towards the Report ITU-R SM.[PLANNING_SMN] - Optimization of the planning of spectrum monitoring networks topology in VHF/UHF range using irregular model of monitoring networks     N/A  
[ 141 ]  
 
2015-03-03 WP 6A   Liaison statement to ITU-R Study Groups 1, 3, 4, 5 and 7, ITU-T Study Group 5 and ITU-D Study Groups 1 and 2 - Human exposure to RF fields from broadcast transmitters     N/A  
[ 140 ]  
 
2015-02-25 Russian Federation   Proposal for revision of Report ITU -R SM.2256 - Spectrum occupancy measurements and evaluation     N/A  
[ 139 ]  
 
2015-02-25 Russian Federation   Draft revision of Recommendation ITU -R SM.1880 - Spectrum occupancy measurement     N/A  
[ 138 ]  
 
2015-02-25 BR Study Groups Department   This document has been withdrawn     N/A  
[ 137 ]  
 
2015-02-11 ITU-T SG 5   Liaison statement on comments to the WHO Monograph "Radio Frequency fields: Environmental Health Criteria, Chapter 2: Sources, measurements and exposures"     N/A  
[ 136 ]  
 
2015-02-10 WP 5D   Liaison statement to WP 1A (copy for information to WPs 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems     N/A  
[ 135 ]  
 
2015-02-10 ITU-T SG 5   Liaison statement on ITU-T Question 7/5 work items for the 2014-2018 study period (reply to ITU-D Study Group 2 - Document 2/113)     N/A  
[ 134 ]  
 
2015-02-06 Chairman, SG 1   Results of the 21st RAG meeting (Geneva, 24 to 27 June 2014)     N/A  
[ 133 ]  
 
2014-11-17 ITU-D SG 2   Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T Study Group 5 , ITU-R Study Group 1, ITU-R Study Group 5, ITU-R Study Group 6 and their relevant Working Parties on Q7/2 work items for the 2014 - 2018 study period     N/A  
[ 132 ]  
 
2014-11-10 WP 5A   Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A, 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communications systems     N/A  
[ 131 ]  
 
2014-11-05 WP 5B   Liaison statement to Working Parties 1C, 5A and 5C - Station call-sign identification to be used by oceanographic radar in frequency band 3 to 50 MHz     N/A  
[ 130 ]  
 
2014-10-26 Israel (State of)   RF Human hazards - Intersectoral activities     N/A  
[ 129 ]  
 
2014-10-17 WP 7D   Liaison statement to Working Party 1C - Working document towards a preliminary draft new Report ITU-R RA.[SATMON]     227/7  
[ 128 ]  
 
2014-09-30 ITU-T SG 9   Liaison statement on leakage of radio frequency energy from J.HiNoC systems and coexistence of wired telecommunications with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T J.195.1 (J.HINOC-REQ)     N/A  
[ 127 ]  
 
2014-09-15 WP 3L   Reply liaison statement to Working Party 1C - Information documents on indoor noise measurement     N/A  
[ 126 ]  
 
2014-08-08 ITU-T WP 2/5   Liaison statement on information about work that is being carried out within work under study in ITU-T Question 7/5     N/A  
[ 125 ]  
 
2014-06-20 WP 1A   Liaison statement to ITU-T Study Groups 5 and 9, and ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C and 7D - Leakage of radio frequency energy from J.HiNoC systems     N/A  
Resultats:174 documents
Résultats :  1 - 2 - 3 - 4  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2015-08-28