Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP1C : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R WP1C  C 

UIT-R WP1C

Comprobación Técnica del Espectro

Resultados :56 documentos
Resultados :  1 - 2 - 3  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Fecha Origen Título Cuestiones
[ 56 ]  
 
2013-05-22 Rohde & Schwarz GmbH & Co. KG   Draft revision of Recommendation ITU-R SM.1837     N/A (no se aplica)  
[ 55 ]  
 
2013-05-21 Chairman, CG on Spectrum Monitoring Evolution   Working document towards a preliminary draft new Report ITU-R SM.[SPEC_MON_EVOLUTION] - Spectrum Monitoring Evolution     N/A (no se aplica)  
[ 54 ]  
 
2013-05-21 Chairman, CG on Spectrum Monitoring Evolution   Preliminary draft new Recommendation ITU-R SM.[SPEC_MON_EVOLUTION] - Spectrum Monitoring Evolution     N/A (no se aplica)  
[ 53 ]  
 
2013-05-17 Chairman, CG on DF Accuracy   Preliminary draft new Recommendation ITU-R SM[DF_ACCURACY] - Test procedure for measuring DF accuracy     N/A (no se aplica)  
[ 52 ]  
 
2013-05-16 Chairman, SG 1   Results of the 19th RAG meeting (Geneva, 25 to 27 June 2012)     N/A (no se aplica)  
[ 51 ]  
 
2013-05-10 United States of America   Preliminary draft revision of Recommendation ITU-R SM.1051 - Priority of identifying and eliminating harmful interference in the band 406-406.1 MHz     N/A (no se aplica)  
[ 50 ]  
 
2013-05-08 WP 6A   Liaison statement to ITU-T Study Group 5 and ITU-R Working Party 1A (copy to ITU-R Working Parties 1C, 5A, 5B, and 5C for information) - Coexistence of wired and wireless communications systems     N/A (no se aplica)  
[ 49 ]  
 
2013-04-30 Germany (Federal Republic of)   Preliminary draft revision of Recommendation ITU-R. SM 575-1 - Protection of fixed monitoring stations against interference     N/A (no se aplica)  
[ 48 ]  
 
2013-04-17 ITU-T FG-DR&NRR   Status report of the Focus Group on Disaster Relief Systems, Network Resilience and Recovery (FG-DR&NRR)     N/A (no se aplica)  
[ 47 ]  
 
2013-03-28 Kazakhstan (Republic of)   Working materials towards a future output document on spectrum monitoring station planning - Planning of VHF/UHF spectrum monitoring networks in mountainous regions     N/A (no se aplica)  
[ 46 ]  
 
2013-02-15 ITU-T SG 5   Work under study in ITU-T Question 7/5     N/A (no se aplica)  
[ 45 ]  
+Add.1 
2013-02-15 ITU-T SG 5   Liaison statement - Study Group 5 activities related to interference between radio signal and device or cable connected to wired broadband networks and cable television networks     N/A (no se aplica)  
[ 44 ]  
 
2013-01-22 Russian Federation   Working document towards a preliminary draft new Report - Procedures for planning and optimization of spectrum-monitoring networks in the VHF/UHF frequency band     N/A (no se aplica)  
[ 43 ]  
 
2012-11-02 WP 6A   Reply liaison statement on Recommendation ITU-R SM.1875 - DVB-T coverage measurements and verification of planning criteria     N/A (no se aplica)  
[ 42 ]  
 
2012-08-16 ITU-D SG 1   Liaison statement on ITU-D Q. 23/1     N/A (no se aplica)  
[ 41 ]  
 
2012-07-03 Chairman, FG-DR&NRR   Liaison statement - Establishment of Focus Group on Disaster Relief Systems, Network Resilience and Recovery     N/A (no se aplica)  
[ 40 ]  
 
2012-07-02 WP 3L   Liaison statement to Working Party 1A (copy to Working Party 1C) - Question ITU-R 230-2/3 brought to the attention fo Study Group 1     N/A (no se aplica)  
[ 39 ]  
 
2012-06-27 Chairmen, SG 1 and WP 1C   Editorial revision of Annexes 1 and 2 to Recommendation ITU-R SM.1875 - DVB-T coverage measurement and verification of planning criteria     N/A (no se aplica)  
[ 38 ]  
 
2012-06-27 SG 1   Liaison statement to Working Party 4C (copy to Working Party 1C) - Report ITU-R SM.[406MHZIX]     N/A (no se aplica)  
[ 37 ]  
 
2012-06-15 WP 1A   Liaison statement to Working Party 3L (copy to Working Party 1C) - Question ITU-R 230-2/3 brought to the attention of Study Group 1     N/A (no se aplica)  
[ 36 ]  
+Ann.1-5 
2012-06-15 Chairman, WP 1C   Report of the meeting of Working Party 1C (Geneva, 6 - 13 June 2012)     N/A (no se aplica)  
[ 35 ]  
 
2012-06-12 Director, BR   Final list of Participants - Geneva, 6-12 June 2012     N/A (no se aplica)  
[ 34 ]  
 
2012-06-05 BR Study Group Department   List of documents issued     N/A (no se aplica)  
[ 33 ]  
 
2012-06-05 WP 5A   Liaison statement to relevant Working Parties of Study Group 5 on further studies on cognitive radio systems (CRS) (copy for information to relevant Working Parties of Study Groups 1, 4, 6 and 7)     N/A (no se aplica)  
[ 32 ]  
 
2012-05-30 Korea (Republic of) , THALES Communications   Working document towards a preliminary draft revision of Recommendation ITU-R SM.1600 Technical identification of digital signals     N/A (no se aplica)  
Resultados :56 documentos
Resultados :  1 - 2 - 3  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

 

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2013-05-23