Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : SG07 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R SG07  C 

UIT-R SG07

Servicios Científicos

Resultados :73 documentos
Resultados :  1 - 2 - 3  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Fecha Origen Título Cuestiones
[ 73 ]  
 
2014-05-20 WP 7A   Draft revision of Recommendation ITU-R TF.374-5 - Precise frequency and time-signal transmissions     N/A (no se aplica)  
[ 72 ]  
 
2014-05-19 WP 7C   Draft new Report ITU-R RS.[EESS-9GHz_OOBE] - RF compatibility of unwanted emissions from 9 GHz EESS synthetic aperture radars (SAR) with the EESS (passive), SRS (passive), SRS and RAS operating in the frequency bands 8 400-8 500 MHz and 10.6-10.7 GHz, respectively     N/A (no se aplica)  
[ 71 ]  
 
2014-05-19 WP 7B   Draft new Report ITU-R SA.[SRS SHARING 37 GHz]- Protection of SRS and FSS systems sharing the 37.5-38 GHz band     211/7  
[ 70 ]  
 
2014-02-27 ITU-T LS 07R1   FG Bridging the Gap from Innovation to Standards (FG Innovation) - Liaison statement on New Standardization Activities for ITU-T Study Groups and ICT Innovation Panel [to all ITU-T Study Groups, ITU-D Study Groups and ITU-R Study Groups]     N/A (no se aplica)  
[ 69 ]  
 
2013-12-02 WP 5B   Liaison statement to Working Party 7D (copy to Study Group 7) - Possible modification of RR footnote No. 5.511F     N/A (no se aplica)  
[ 68 ]  
 
2013-11-06 Chairman, ITU-D SG 1   Liaison statement - Agreed Working Definition of the Term "ICT" - Correspondence Group on the Elaboration of a Working Definition of the Term "ICT"     N/A (no se aplica)  
[ 67 ]  
 
2013-09-19 Chairman, SG 7   Summary Report of actions taken during the meeting of Radiocommunication Study Group 7 (Geneva, 10 and 18 September 2013)     N/A (no se aplica)  
[ 66 ]  
 
2013-09-18 Director, BR   Final list of participants - Study Group 7 (Geneva, 10 & 18 September 2013)     N/A (no se aplica)  
[ 65 ]  
 
2013-09-17 BR Study Groups Department   List of documents issued (Documents 7/28(Rev.1), 30(Rev.1), 31(Rev.1), 32(Rev.1), 41(Rev.1) and 7/48-65)     N/A (no se aplica)  
[ 64 ]  
(Rev.1) 
2013-09-17 WP 7A   Draft revision to Recommendation ITU-R TF.686-2 - Glossary and definitions of time and frequency terms     N/A (no se aplica)  
[ 63 ]  
 
2013-09-17 WP 7A   Draft revision of Question ITU-R 236/7 - The future of the UTC time scale     236/7  
[ 62 ]  
(Rev.1) 
2013-09-17 WP 7B   Draft new Report ITU-R SA.[SRS/MSS SHAR] - Sharing studies between mobile-satellite service (MSS) and space research service (SRS) in the 22-26 GHz range     N/A (no se aplica)  
[ 61 ]  
(Rev.1) 
2013-09-17 WP 7D   Draft revision of Report ITU-R RA.2126 - Techniques for mitigation of radio frequency interference in radio astronomy     237/7  
[ 60 ]  
 
2013-09-17 WP 7D   Proposed update to the Handbook on Radio Astronomy     N/A (no se aplica)  
[ 59 ]  
(Rev.1) 
2013-09-17 WP 7B   Draft revision of Recommendation ITU-R SA.1626 - Feasibility of sharing between the space research service (space-to-Earth) and the fixed and mobile service in the band 14.8-15.35 GHz     N/A (no se aplica)  
[ 58 ]  
(Rev.1) 
2013-09-17 WP 7B   Draft revision of Recommendation ITU-R SA.1276-3 - Orbital locations of data relay satellites to be protected from the emissions of fixed service systems operating in the band 25.25-27.5 GHz     N/A (no se aplica)  
[ 57 ]  
(Rev.1) 
2013-09-17 WP 7B   Draft revision of Recommendation ITU-R SA.1275-3 - Orbital locations of data relay satellites to be protected from the emissions of fixed service systems operating in the band 2 200-2 290 MHz     N/A (no se aplica)  
[ 56 ]  
(Rev.1) 
2013-09-17 WP 7B   Draft new Report ITU-R SA.[SRS/AIRCRAFT 2 GHz] - Protection of SRS earth stations from transmitting aircraft stations in the 2 200-2 290 MHz band     N/A (no se aplica)  
[ 55 ]  
(Rev.1) 
2013-09-17 WP 7B   Draft new Report ITU-R SA.[EESS-FS-7GHz] - Sharing between the EESS (Earth-to-space) and the fixed service in the 7-8 GHz range     N/A (no se aplica)  
[ 54 ]  
 
2013-09-17 WP 7C   Note from Study Group 7 Chairman to Chairman of CPM-15     N/A (no se aplica)  
[ 53 ]  
(Rev.1) 
2013-09-17 WP 7C   Draft new Recommendation ITU-R RS.[EESS-9GHz-CHAR] - Characteristics of synthetic aperture radars operating in the Earth exploration-satellite service (active) around 9 600 MHz     N/A (no se aplica)  
[ 52 ]  
 
2013-09-17 WP 7C   Draft new Question ITU-R XXX/47 - Detection and resolution of radio frequency interference to Earth exploration-satellite service (passive) sensors     N/A (no se aplica)  
[ 51 ]  
(Rev.1) 
2013-09-17 WP 7C   Draft new Report ITU-R RS.[EESS-9GHz_SPECTREQ] - Spectrum requirements for spaceborne synthetic aperture radar (SAR) applications planned in an extended allocation to the Earth exploration-satellite service (EESS) around 9600 MHz     N/A (no se aplica)  
[ 50 ]  
(Rev.1) 
2013-09-17 WP 7C   Draft new Report ITU-R RS.[EESS-SCAT-ARNS 1 215-1 300 MHz] - Potential interference from EESS (active) scatterometers into ARNS systems in the frequency band 1 215-1 300 MHz     N/A (no se aplica)  
[ 49 ]  
(Rev.1) 
2013-09-17 WP 7C   Draft new Recommendation ITU-R RS.[SPAC_RAD_SNDR] - Typical technical and operating characteristics for spaceborne radar sounder systems using the 40-50 MHz band     N/A (no se aplica)  
Resultados :73 documentos
Resultados :  1 - 2 - 3  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

 

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2014-05-21