International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP7B : Contributions : 181 Recently posted -  Search Meeting Documents
   
[181]  Report on the September 2009 meeting of Working Party 7B with a view to its next meeting (June 2010)

Format

Size

Posted

English

Word  

718848 bytes 2009-09-28 [181] Annex 14 - Working document towards a preliminary draft new Report ITU-R SA.[23 GHz SRS SHARING] - Compatibility between the space research service (Earth-to-space) and the systems in the inter-satellite service (except for non-GSO-non-GSO) in the band 22.55-23.15 G

Word  

409088 bytes 2009-09-28 [181] Annex 13 - Working document towards a preliminary draft new Report ITU-R SA.[23 GHz SRS NGSO ISS COMPATIBILITY] - Compatibility between the space research service (Earth-to-space) and the non-GSO-to-non-GSO systems on the inter-satellite service in the band 22.55-23

Word  

778752 bytes 2009-09-29 [181] Annex 12 - Preliminary draft new Report ITU-R SA.[SRS-AMS(37-38 GHz)] - Study on compatitility between the mobile service (aeronautical) and the space research service (space-to-Earth) in the frequency band 37-38 GHz

Word  

1272320 bytes 2009-09-29 [181] Annex 11 - Preliminary draft new Report ITU-R SA.[SRS-DS FRQ] - Selection of frequency bands in the 1-120 GHz range for deep-space research

Word  

818688 bytes 2009-09-29 [181] Annex 10 - Preliminary draft new Report ITU-R SA.[LINK PERF] on method for calculating link performance in the space research service

Word  

192512 bytes 2009-09-29 [181] Annex 09 - Preliminary draft new Recommendation ITU-R SA.[SRS 23 GHz CHAR] - Technical and operational characteristics of space research service (Earth-to-space) systems for use in the 22.55-23.15 GHz band

Word  

172544 bytes 2009-10-1 [181] Annex 08 - Preliminary draft revision of Recommendation ITU-R SA.1276-2 - Orbital locations of data relay satellites to be protected from the emissions of fixed service systems operating in the band 25.25-27.5 GHz

Word  

176128 bytes 2009-10-1 [181] Annex 07 - Preliminary draft revision of Recommendation ITU-R SA.1275-2 - Orbital locations of data relay satellites to be protected from the emissions of fixed service systems operating in the band 2 200-2 290 MHz

Word  

198656 bytes 2009-10-1 [181] Annex 06 - Working Document towards draft CPM text on WRC-12 Agenda item 1.24

Word  

216576 bytes 2009-10-1 [181] Annex 05 - Work plan and milestones for WRC-12 Agenda item 1.24

Word  

203776 bytes 2009-10-1 [181] Annex 04 - Working Document towards draft CPM text on WRC-12 Agenda item 1.12

Word  

184320 bytes 2009-09-30 [181] Annex 03 - Work plan and milestones for WRC-12 Agenda item 1.12

Word  

206848 bytes 2009-09-30 [181] Annex 02 - Working document towards draft CPM text on WRC-12 Agenda item 1.11

Word  

183296 bytes 2009-10-1 [181] Annex 01 - Work plan and milestones for WRC-12 Agenda Item 1.11

Word  

160768 bytes 2009-10-28 [181]  - Report on the September 2009 meeting of Working Party 7B with a view to its next meeting (June 2010)
 

Document :

ITU-R WP7B  Contribution  181

Title :

Report on the September 2009 meeting of Working Party 7B with a view to its next meeting (June 2010)

Date :

2009-09-14

Source :

Chairman, WP 7B

Access :

Restricted to TIES users [ITU-R]

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2009-10-28