Contributions  |
|
Number
|
Received
|
Source
|
Title
|
Questions
|
|
[ 87 ]
|
2009-12-14 |
WP 5B
|
Liaison statement to Working Party 1C - Radar emission measurements in the out of band domain
|
230/1
|
|
[ 86 ]
|
2009-12-08 |
WP 5C
|
Reply to a liaison statement from Working Party 1C (copy to WP 3L) - Radio noise in the HF frequency band
|
231/1
|
|
[ 85 ]
|
2009-11-20 |
BR Study Group Department
|
ITU-R Study Group 3 Question to be brought to the attention of ITU-R Study Group 1
|
N/A
|
|
[ 84 ]
|
2009-10-21 |
ITU-T SG 5
|
Reply liaison statement to ITU-R WP 1C on actions related to WTSA-08 Resolution 72
|
N/A
|
|
[ 83 ]
|
2009-10-19 |
Rapporteur, WP 1C Rapporteur Group on SMH issues
|
Spectrum Monitoring Handbook Edition 2010 - Report of the 2nd meeting of the Rapporteur's Group on Spectrum Monitoring Handbook issues
|
N/A
|
|
[ 82 ]
|
2009-10-09 |
ITU-R SG 1
|
Reply liaison statement to ITU-D Study Group 2 - Resolution 9 (Rev. DOHA, 2006), draft guidelines for the establishment of a system of fees (copy for information to Working Parties 1B and 1C)
|
N/A
|
|
[ 81 ]
+Ann.1-10 |
2009-09-23 |
Chairman, WP 1C
|
Report on the meeting of Working Party 1C (Geneva, 16 - 22 September 2009)
|
N/A
|
|
[ 80 ]
(Rev.1) |
2009-09-22 |
Director, BR
|
Final List of Participants - Geneva, 16-22 September 2009
|
N/A
|
|
[ 79 ]
|
2009-09-21 |
Rapporteur Group on ITU-R Questions
|
Preliminary review of ITU-R Questions assigned to Study Group 1
|
N/A
|
|
[ 78 ]
|
2009-09-15 |
BR Study Group Department
|
List of documents issued
|
N/A
|
|
[ 77 ]
|
2009-09-08 |
Chairman WP 1C
|
Review Circular Letter CR/159
|
N/A
|
|
[ 76 ]
|
2009-09-09 |
Thales Communications
|
Comments on Document 1C/57 - Preliminary draft new Question ITU-R ___/1 - Standardized interface between SMS4DC and radiomonitoring equipment
|
N/A
|
|
[ 75 ]
|
2009-09-09 |
CBS, Inc.
|
Working document towards a preliminary draft new Report on measurement techniques for power line high data rate telecommunication systems
|
N/A
|
|
[ 74 ]
|
2009-09-09 |
European Broadcasting Union (EBU)
|
Support to contributions from Broadcasting Organizations
|
N/A
|
|
[ 73 ]
|
2009-09-09 |
Germany (Federal Republic of)
,
Korea (Republic of)
|
Preliminary draft revision of Recommendation ITU-R SM.1753 - Radio noise measurements
|
N/A
|
|
[ 72 ]
|
2009-09-09 |
Germany (Federal Republic of)
|
Working document towards a preliminary draft new Report - HF man-made noise measurements
|
214-3/3
|
|
[ 71 ]
|
2009-09-08 |
Brazil (Federative Republic of)
|
Complementary study to the document "Alternative method on measuring interference from power line high data rate telecommunications systems using mobile monitoring station" (Question ITU-R 218/1)
|
218/1
|
|
[ 70 ]
|
2009-09-08 |
CBS, Inc.
|
Broadband over power (BPL/PLT) studies and testing
|
N/A
|
|
[ 69 ]
|
2009-09-08 |
CBS, Inc.
|
Working document towards a preliminary draft new Report on measurement techniques for power line high data rate telecommunication systems
|
N/A
|
|
[ 68 ]
|
2009-09-08 |
North American Broadcasters Association (NABA)
|
Working document towards a preliminary draft new Report - On measurement techniques for power line high data rate telecommunication systems
|
N/A
|
|
[ 67 ]
|
2009-09-09 |
Chairman, SG 1
|
Status of the third stage of the Report on WTDC-06 Resolution 9 (Rev.Doha, 2006)
|
N/A
|
|
[ 66 ]
|
2009-09-08 |
United States of America
|
Preliminary draft new Recommendation ITU-R SM.[6 GHz] - Spectrum monitoring from 20 MHz to 6 GHz
|
N/A
|
|
[ 65 ]
(Rev.1) |
2009-09-04 |
North American Broadcasters Association (NABA)
|
New information on measurement guidelines for broadband PLT
|
N/A
|
|
[ 64 ]
|
2009-09-04 |
North American Broadcasters Association (NABA)
|
Working document towards a preliminary draft new Report - On measurement techniques for power line high data rate telecommunication systems
|
221/1, 218/1
|
|
[ 63 ]
|
2009-08-31 |
China (People's Republic of)
|
Proposed revision of Recommendation ITU-R SM.182-5
|
N/A
|
Results:87 total items. Result page:
1 -
2 -
3 -
4
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):