International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP9B : Contributions : 249 Recently posted -  Search Meeting Documents
   
[249]  Chairman's report - Meeting 8-16 May 2007

ITU-R WP9B - Radio-frequency channel arrangements, radio system characteristics, interconnection, maintenance and various applications

Contribution : 249

Received on : 2007-05-18

Source : Chairman, WP 9B

Access :  Locked Document restricted to TIES users [ITU-R]


Available languages and formats :

 
Down

Click on the selected format and language to get the document

   
Format Size Posted
English

Word Document Word  

146432 bytes 2007-06-14 [249] Annex 14 - Historical record of the Working Party meetings

Word Document Word  

192000 bytes 2007-06-13 [249] Annex 13 - List of acronyms, abbreviations and terms defined in the draft Recommendations/Reports developed at the May 2007 Working Party 9B meeting

Word Document Word  

64512 bytes 2007-06-13 [249] Annex 12 - Draft liaison statement to Working Parties 8A and 8F

Word Document Word  

70144 bytes 2007-06-13 [249] Annex 11 - Working document towards a PDNR ITU-R F.[FWA-2.5 GHz] - Frequency block arrangements for fixed wireless access systems in the range 2 500-2 690 MHz

Word Document Word  

71168 bytes 2007-06-13 [249] Annex 10 - Working document towards a PDNR ITU-R F.[COMPATIBILITY] - Guidelines for addressing compatibility between fixed service systems operating in neighbouring countries in the frequency range above 1 GHz

Word Document Word  

68096 bytes 2007-06-13 [249] Annex 09 - Preliminary draft new Question ITU-R [COMP/9] - Guidelines for addressing compatibility between fixed service systems, operating in neighbouring countries in the frequency range above 1 GHz

Word Document Word  

94208 bytes 2007-06-14 [249] Annex 08 - Preliminary draft revision of Report ITU-R F.2086 - Technical and operational characteristics and applications of broadband wireless access in the fixed service

Word Document Word  

59392 bytes 2007-06-15 [249] Annex 07 - Note for a carried-over document

Word Document Word  

209408 bytes 2007-06-13 [249] Annex 06 - PDN Report ITU-R F.[HAPS-FS] - Consideration of technical aspects related to procedures for effecting coordination or seeking agreement and associated technical criteria and system characteristics to be used with respect to HAPS

Word Document Word  

72704 bytes 2007-06-13 [249] Annex 05 - Considerations on Questions assigned to Working Party 9B

Word Document Word  

58368 bytes 2007-06-13 [249] Annex 04 - Liaison statements to other fora

Word Document Word  

96256 bytes 2007-06-13 [249] Annex 03 - List of output (TEMP) documents

Word Document Word  

81920 bytes 2007-06-13 [249] Annex 02 - Status of the Questions assigned to Working Party 9B

Word Document Word  

66048 bytes 2007-06-13 [249] Annex 01 - Structure of work

Word Document Word  

167936 bytes 2007-06-15 [249]  - Report on the meeting of Working Party 9B (Geneva, 8-16 May 2007)

 

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2007-06-15