International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4B  C 

ITU-R WP4B

Systems, air interfaces, performance and availability objectives for FSS, including IP-based applications and satellite news gathering

Results:140 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 140 ]  
 
2007-08-01 ICG-SAT   Liaison statement on aspects of common and critical interest to the satellite industry     N/A  
[ 139 ]  
 
2007-08-01 WP 8A   Liaison statement to Working Parties 6B and 9D - System characteristics of television outside broadcast (TVOB), electronic news gathering (ENG) and electronic field production (EFP) in the mobile service for use in sharing studies     N/A  
[ 138 ]  
 
2007-08-01 ICG-SAT   Liaison statement on Activities on standardization for emergency telecommunications     N/A  
[ 137 ]  
 
2007-06-29 ITU-T SG 15   List of liaison statements agreed at the ITU-T SG 15 meeting (Geneva, 4-15 June 2007)     N/A  
[ 136 ]  
 
2007-06-13 WP 6A   Liaison statement to Working Party 4B - User requirements for the quality of baseband SDTV and HDTV signals when transmitted by digital satellite news gathering (SNG)     N/A  
[ 135 ]  
+Ann.1-11 
2007-06-05 Chairman, WP 4B   Chairman's report - Meeting 28 May - 1 June 2007     N/A  
[ 134 ]  
 
2007-06-01 Director, BR   Final List of Participants - Workint Party 4B (Geneva, 28 May - 1 June 2007)     N/A  
[ 133 ]  
 
2007-05-23 BR Study Group Department   List of documents issued     N/A  
[ 132 ]  
 
2007-05-21 United States of America   Cross-layer based QoS provisioning in satellite IP networks     263-1/4  
[ 131 ]  
 
2007-05-21 United States of America   PDNR ITU-R S.[Availability] - Availability objectives for hypothetical reference digital paths in the fixed-satellite service     73-2/4  
[ 130 ]  
 
2007-05-21 Japan   Working document on quality of service (QoS) aspects of inter-working with terrestrial wireless access in the FSS     263-1/4  
[ 129 ]  
 
2007-05-17 ITU-T SG13   Liaison statement to Working Party 4B - NGN/Satellite Workshop and meeting of the ICG-SAT     N/A  
[ 128 ]  
 
2007-05-10 Korea (Republic of)   Working document towards a preliminary draft new Recommendation - Multi-carrier based multiple-access satellite systems and performance enhancement techniques     46/4  
[ 127 ]  
 
2007-05-10 Korea (Republic of)   Working document towards a preliminary draft new question - System architecture and performance aspects on cooperative satellite and terrestrial systems     N/A  
[ 126 ]  
 
2007-04-18 BR Study Group Department   ITU-R Study Group 8 question to be brought to the attention of Working Parties 1B, 4B, 6E and 9B     N/A  
[ 125 ]  
 
2007-03-13 BR Study Group Department   ITU-R Study Group 6 Question to be brought to the attention of Working Parties 4B, 8D and 9D     N/A  
[ 124 ]  
 
2007-02-16 WP 7B   Liaison statement to Working Party 4A and Working Party 4B for information - Impact of Recommendation ITU-R S.1432 on the use of the band 18.1-18.3 GHz     N/A  
[ 123 ]  
 
2007-02-16 WP 8F   Liaison statement to relevant external organizations and Working Party 8A (Copy to Working Parties 4B and 8D) - On the preliminary draft new Report ITU-R M.[IP CHAR] "Key technical and operational characteristics for access technologies to support IP applications over land mobile systems" in response to Question ITU-R 223-1/8     N/A  
[ 122 ]  
 
2007-01-11 Coordination Committee for Vocabulary (CCV)   Liaison statement to Radiocommunication Study Groups and Working Parties - Terminology database     N/A  
[ 121 ]  
 
2006-11-20 WP 8D   Liaison statement to Working Parties 8A and 8F (Copy to Working Party 4B) - IP-related study activity for the mobile-satellite service in Working Party 8D     N/A  
[ 120 ]  
 
2006-11-16 ITU-T SG 15   New versions of the Access Network Transport (ANT) standards overview and workplan     N/A  
[ 119 ]  
 
2006-11-15 ITU-T SG15   Response to liaison statement on satellites in Access Network Transport     N/A  
[ 118 ]  
 
2006-11-15 ITU-T SG 15   Response to liaison statement on outage intensity objectives for satellite digital paths     N/A  
[ 117 ]  
 
2006-11-09 WPs 3J and 3M   Liaison statement to WP 4B - Application of Recommendation ITU-R P.1623 to the estimation of outage intensity performance for satellite digital paths     201/3  
[ 116 ]  
 
2006-11-03 WP 8A   Liaison statement to Working Parties 6J and 9D copy to 4B, 6E, 7C, 7D, 8B, 8F, 9B, and ITU-T Study Group 9 - System characteristics of television outside broadcast (TVOB), electronic news gathering (ENG) and electronic field production (EFP) in the mobile service     N/A  
Results:140 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2006-11-06