International Telecommunication Union   ITU
Franįais  Espaņol
 
Site map Contact Us Print version
  Home : ITU-R : TG1/8 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R TG1/8  C 

ITU-R TG1/8

Compatibility between ultra-wideband devices (UWB) and radiocommunications services

Results:443 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 443 ]  
+Ann.1-5 
2006-01-16 Chairman, TG 1/8   Chairman's report - Meeting 12-20 October 2005     N/A  
[ 442 ]  
 
2005-10-19 Director, BR   Final List of Participants - Task Group 1/8     N/A  
[ 441 ]  
 
2005-10-12 WP 6S   Liaison statement to Task Group 1/8 - Interference analysis from devices using ultra-wideband technology into BSS (sound) receiving earth stations operating in the 1.5 GHz, 2.3 GHz and 2.6 GHz bands     227/1  
[ 440 ]  
 
2005-10-12 WP 6E   Liaison statement to TG 1/8 - Impact on the broadcasting service by interference by UWB systems     N/A  
[ 439 ]  
 
2005-10-11 BR Study Group Department   List of documents issued     N/A  
[ 438 ]  
 
2005-10-05 Deutsche Telekom AG   Proposed modifications to preliminary draft new Recommendation ITU-R SM.[UWB.MES]     N/A  
[ 437 ]  
 
2005-10-10 WP 8D   Liaison statement to Task Group 1/8 - Impact of emission of UWB devices on RNSS     N/A  
[ 436 ]  
 
2005-10-06 WP 8D   Liaison statement to TG 1/8 - Further study on the impact of devices using ultra-wideband technology into a receiving earth station operating in the 2.2 GHz band     N/A  
[ 435 ]  
 
2005-10-05 Fixed Service CG Coordinator   CG-FS Report on activity and contributions     N/A  
[ 434 ]  
 
2005-10-05 United States of America   Compatibility between UWB emissions and both IMT-2000 and land mobile devices operating in the 1 750-1 780 / 1 840-1 870 and 1 850-1 910 / 1 930-1 990 MHz frequency band     N/A  
[ 433 ]  
 
2005-10-05 Deutsche Telekom AG   Measurability of the UWB emission limits required for adequate protection of terrestrial broadcasting services in the VHF and UHF bands     N/A  
[ 432 ]  
(Rev.1) 
2005-10-05 BR Study Group Department   Measurements of the susceptibility of GSM and CDMA-2000 mobile phones to UWB signals     N/A  
[ 431 ]  
 
2005-10-05 France   Interference from UWB devices into fixed satellite service in the downlink direction in the 4 GHz band     227/1  
[ 430 ]  
 
2005-10-05 United States of America   Definition of general terms in the terminology section of the characteristics PDNR     N/A  
[ 429 ]  
 
2005-10-05 Freescale Semiconductor, Inc.   UWB mask proposal for industry     N/A  
[ 428 ]  
 
2005-10-05 Siemens A.G. , Robert Bosch GmbH   Proposed modification to Attachment 6 of Annex 5 to TG 1/8 Chairman's Report - Studies related to the impact of devices using ultra-wideband technology on systems operating within the Earth exploration-satellite, space research service     N/A  
[ 427 ]  
 
2005-10-05 Siemens A.G. , Robert Bosch GmbH   Amendment regarding apportionment of interference from ultra-wideband devices to the Earth exploration-satellite service in Attachment 6 to Annex 5 to Document 1-8/347     N/A  
[ 426 ]  
 
2005-10-05 Vodafone Group Services Limited   Review of ultra-wideband terms and definitions & proposals for consequential modifications to PDNR ITU-R SM.[UWB.CHAR]     N/A  
[ 425 ]  
 
2005-10-05 North American Broadcasters Association   Potential aggregate interference from UWB devices to FSS earth stations in "office block scenario"     227/1  
[ 424 ]  
 
2005-10-05 TELESAT CANADA   System characteristics of the 8 GHz EESS space-to-Earth band for use in studies of the impact of devices using UWB technology     N/A  
[ 423 ]  
 
2005-10-04 United States of America   Working document on values to be included in Annex 1 of the PDNR SM.[UWB.COMP]     N/A  
[ 422 ]  
 
2005-10-05 TELESAT CANADA   Application of the Fantasma methodology to the 4 GHz FSS, upper 6 GHz FSS, 8 GHz EESS and 12 GHz FSS/BSS satellite downlink bands     N/A  
[ 421 ]  
 
2005-10-05 Robert Bosch GmbH, Siemens AG   Insertion of the activity factor of 24 GHz short range radars in studies related to the impact of devices using ultra-wideband technology on systems operating within the fixed service in Attachment 2 to Annex 5 to Document 1-8/347     N/A  
[ 420 ]  
 
2005-10-05 Robert Bosch GmbH, Siemens AG   Elimination of language regarding separation distance and deactivation requirement for SRR devices operating in the 77 to 81 GHz range in Attachment 6 to Annex 5 to Document 1-8/347     N/A  
[ 419 ]  
 
2005-10-05 Robert Bosch Gmbh, Siemens AG   Additional information in the summary table of impact studies in Annex 2 to Document 1-8/347     N/A  
[ 418 ]  
 
2005-10-04 Robert Bosch GmbH, Siemens AG   Traffic density study for use in compatibility studies between SRR devices around 24 GHz and earth exploration satellites (EESS)     N/A  
[ 417 ]  
 
2005-10-04 United Kingdom of Great Britain and Northern Ireland   Proposed modifications to the considerings to TG 1/8 PDNR SM.[UWB.FRAME] and to the common considerings of PDNRs SM.[UWB.CHAR] and SM.[UWB.COMP]     N/A  
[ 416 ]  
 
2005-10-04 United Kingdom of Great Britain and Northern Ireland   Proposed additions to the preliminary draft new Recommendation ITU-R SM.[UWB.CHAR]     227/1, 226/1  
[ 415 ]  
 
2005-10-04 United Kingdom of Great Britain and Northern Ireland   Proposed editorial changes to the characteristics recommendation     N/A  
[ 414 ]  
 
2005-10-04 Siemens Mobile Communications   New scenario for UWB interference aggregation into a fixed service receiver     N/A  
[ 413 ]  
 
2005-10-05 Germany (Federal Republic of)   Proposed modifications to the PNDR ITU-R SM.[UWB.CHAR], Annex C, section C3     N/A  
[ 412 ]  
 
2005-10-04 Siemens Mobile Communications   Analysis of "K" mitigation factors KLOS and KB     N/A  
[ 411 ]  
 
2005-10-03 France   Proposed changes to PDNR SM.[UWB.FRAME]     N/A  
[ 410 ]  
 
2005-10-04 ICAO International Civil Aviation Organisation   Proposed modifications to PDNR ITU-R SM.[UWB.COMP] - Impact of systems using ultra-wideband technology on systems operating within radiocommunication services     N/A  
[ 409 ]  
 
2005-10-04 Japan   Proposed modifications to the PDNR SM.[UWB.MES]     227/1  
[ 408 ]  
 
2005-10-04 Korea (Republic of)   Proposed modification of Attachment 5 of Annex 5 to Task Group 1/8 Chairman's Report     227/1  
[ 407 ]  
 
2005-10-04 Korea (Republic of)   Proposed modification of Attachment 7 of Annex 5 to Task Group 1/8 Chairman's Report     227/1  
[ 406 ]  
 
2005-10-04 Korea (Republic of)   Proposed modification of Annex 2 to Task Group 1/8 Chairman's Report PDNR ITU-R SM.[UWB.COMP] - Impact of systems using ultra-wideband technology on systems operating within radiocommunication services     227/1  
[ 405 ]  
 
2005-10-04 Korea (Republic of)   Proposed modification of Attachment 1 of Annex 5 to Task Group 1/8 Chairman's Report     227/1  
[ 404 ]  
 
2005-10-04 ICAO International Civil Aviation Organisation   Proposed modifications to preliminary draft new Report ITU-R SM.[UWB.XYZ] - Studies related to the impact of devices using ultra-wideband technology on radiocommunication services     N/A  
[ 403 ]  
 
2005-10-05 Canada   Summary tables of analytical studies for integration into Annex 1 to PDNR ITU-R SM.[UWB.COMP]     N/A  
[ 402 ]  
 
2005-10-05 Canada   Revisions to Attachment 3 and associated Section 6 summary tables of the draft new Report on the impact of devices using UWB technology     N/A  
[ 401 ]  
 
2005-10-05 Canada   Proposed modifications to the draft new Report ITU-R SM[UWB.XYZ]     N/A  
[ 400 ]  
 
2005-10-04 Japan   Proposed update of Appendix 1 to Annex of PDNR ITU-R SM.[UWB.FRAME] for its additional information on Japan's preliminary UWB emission mask under study     N/A  
[ 399 ]  
 
2005-10-04 Japan   Proposed modification to Annex 5 to TG 1/8 Chairman's Report preliminary draft new Report ITU-R SM.[UWB.XYZ] - Studies related to the impact of devices using ultra-wideband technology on radiocommunication services     N/A  
[ 398 ]  
 
2005-10-04 Intel   Proposed modifications to Section 3.3 (next Annex 2) (Fixed Service) - Subsections 0 to 6 (bands below 10.6 GHz) and new Appendix 3 of the preliminary draft new Report on [compatibility] studies between UWB devices and radiocommunication services     N/A  
[ 397 ]  
 
2005-10-02 WP 3K   Liaison statement to Task Group 1/8 from Working Party 3K concerning draft new Recommendation ITU-R P.[UWB.PROP] - Propagation prediction methods for the planning of ultra-wideband applications in the frequency range 1 GHz to 10 GHz     211/3  
[ 396 ]  
 
2005-10-04 Siemens Mobile Communications   New scenario for UWB interference aggregation into a fixed service receiver     N/A  
[ 395 ]  
 
2005-10-04 Ericsson, Nokia, Siemens, Deutsche Telekom   Possible impact of UWB on candidate frequency bands for "Systems beyond IMT-2000" in the frequency range below 6 GHz     N/A  
[ 394 ]  
 
2005-10-03 NABA   Proposed modifications to working document towards a PDNR ITU-R SM.[UWB.MES]     227/1  
Results:443 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright Š ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2005-06-06