International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP1B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1B  C 

ITU-R WP1B

Spectrum management methodologies

Results:83 total items.
Result page:  1 - 2  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 84 ]  
 
2002-10-30 Chairman, WP 1B   Chairman's Report of the meeting of WP 1B (Geneva, 17-23 July 2002)     N/A  
[ 83 ]  
 
2002-10-03 WP 8A   Liaison statement to Working Parties 1A and 1B, copied to Task Group 1/8 and Study Group 8 - Ultra wideband emissions     N/A  
[ 82 ]  
 
2002-09-27 N/A   Liaison Statement to WPs 1A, 1B and TG 1/8 in response to Liaison Statement to WPs 7C, 7D, 6E, 6S, 4A, 9D, 8A and 3J Ultra-wideband Emissions     N/A  
[ 81 ]  
 
2002-07-22 Director, BR   Final List of Participants     N/A  
[ 80 ]  
 
2002-07-18 SC02   Draft element for the Report of the Chairman of the Special Committee - Chapters 5, 6 and 7 of the CPM Report     N/A  
[ 79 ]  
 
2002-07-16 BRSGD   List of documents issued     N/A  
[ 78 ]  
 
2002-07-16 United Kingdom of Great Britain and Northern Ireland   Draft new Recommendation ITU-R SM.[ / ] - Spectrum redeployment as a method of National Spectrum Management     216/1  
[ 77 ]  
 
2002-07-16 United Kingdom of Great Britain and Northern Ireland   Contributions towards the revision of ITU-R Report SM.2012 - Economic aspects of spectrum management     N/A  
[ 76 ]  
 
2002-07-16 Bulgaria (Republic of)   Automation of Article S5 and other relevant RR provisions     N/A  
[ 75 ]  
 
2002-07-16 France   Contribution to carry on the work towards a Report in answer to Questio ITU-R 223/1 and towards a PDNR on guidance on the regulatory framework for national spectrum management     223/1  
[ 74 ]  
 
2002-07-15 Electronic Communications Committee (ECC)   Draft ECC Report - Refarming and secondary trading in a changing radiocommunications world month year     N/A  
[ 73 ]  
 
2002-07-15 Chairman WP 1B   Incentive radio license fee calculation model     N/A  
[ 72 ]  
 
2002-07-15 ITU-R WP 9D Correspondence Group   Sharing and compatibility between the broadcasting service and the fixed service in the VHF and UHF bands     N/A  
[ 71 ]  
 
2002-07-12 IUCAF   The importance of passive radio services and the protection of frequency bands allocated to them: Footnote 5.340     N/A  
[ 69 ]  
 
2002-07-10 United States of America   Working document toward a PDNR [UWB-1] - Characteristics of devices using ultra-wideband (UWB) transmissions     N/A  
[ 68 ]  
 
2002-07-10 United States of America   U.S. National Regulations regarding ultra-wideband transmission systems     N/A  
[ 67 ]  
 
2002-07-09 United Kingdom of Great Britain and Northern Ireland   Proposal to assist the work of ITU-R WP 1B on Question ITU-R 226/1     226/1  
[ 66 ]  
 
2002-07-09 Netherlands (Kingdom of the)   UWB and the concept of footnote 5.340     N/A  
[ 65 ]  
 
2001-11-07 Korea (Republic of)   Guidance on the regulatory framework for national spectrum management     N/A  
[ 64 ]  
 
2002-07-08 Conatel   The spectrum management and monitoring systems (SAAGER) in use in Venezuela     N/A  
[ 63 ]  
 
2001-11-07 ITU-R observer in CISPR SC   Report on the activities of CISPR     N/A  
[ 62 ]  
(Rev.1) 
2002-07-10 France   Comments on the application of Footnote 5.340 and proposed usage     N/A  
[ 61 ]  
 
2001-11-07 Germany (Federal Republic of)   On the difference between unwanted and intended emissions of ultra wideband systems     N/A  
[ 60 ]  
 
2001-11-07 Rapporteur   Draft revision of Recommendation ITU-R SM.1538 - Technical and operating parameters and spectrum requirements for short-range radiocommunication devices     N/A  
[ 59 ]  
 
2001-11-07 TG 6/8   Liaison statement to Study Group 1 and to Working Parties 1A and 1B - Request for information related to sharing between the broadcasting service and other co-primary services in the frequency bands 174-230 MHz and 470-862 MHz     N/A  
[ 58 ]  
 
2001-11-07 WP 3J   Liaison statement to WPs 1A and 1B - Compatibility between Ultra Wideband (UWB) emissions and radiocommunication services     N/A  
[ 57 ]  
 
2001-11-07 JTG 1-6-8-9   Liaison statement to ITU-R Working Parties 1B, 4A, 6E, 6M, 7E, 8A, 8A, 8F, 9B, JRG 8A-9B and ITU-T SG 16 (Q.6/16)-Terrestrial wireless interactive multimedia applications (WRC-03)     N/A  
[ 56 ]  
 
2001-11-07 WP 8A   Liaison statement to Working Parties 1A and 1B - Compatibility between ultra-wideband (UWB) emissions and radiocommunication services     N/A  
[ 55 ]  
 
2001-11-07 WP 8A   [1B/55, 1-6-8-9/48, 6E/232, 6M/121, 8A-9B/135, 8F/643, 9B/183] Liaison statement to ITU-R Joint Task Group 1-6-8-9 - Terrestrial wireless interactive multimedia systems     N/A  
[ 54 ]  
 
2001-11-07 WP 9D   Liaison statement to WP 1A and WP 1B - Compatibility between ultra wideband (UWB) emissions and radiocommunication services     N/A  
[ 53 ]  
 
2001-11-07 WP 4A   Liaison statement to WPs 1A and 1B - Compatibility between UWB emissions and Radiocommunication services     N/A  
[ 52 ]  
 
2001-11-07 WP 9D   Liaison statement to TG 6/8 and, for information, to WPs 1A, 1B and 8A - Sharing and compatibility between the broadcasting service and the fixed service in the VHF and UHF bands     N/A  
[ 51 ]  
 
2001-11-07 Israel (State of)   Report from special Rapporteur representing SG 9 of the first meeting and activities of Task Group 6/8     N/A  
[ 50 ]  
 
2001-11-07 WP 6S   Liaison statement to WP 1A and WP 1B - Compatibility between ultra-wideband (UWB) emissions and radiocommunication services     N/A  
[ 49 ]  
 
2001-11-07 WP 6E   Liaison statement to WPs 1A and 1B - Compatibility between ultra wideband (UWB) emissions and radiocommunication services     N/A  
[ 48 ]  
+Corr.1 
2001-11-07 WP 8F   Liaison statement to ITU-R JTG 1-6-8-9, WP's 1B, 6E, 6M, 8A, 9B and JRG 8A-9B     N/A  
[ 47 ]  
 
2001-11-07 Thales   Concession of the radio monitoring service - The case of Argentina: an innovative solution     N/A  
[ 46 ]  
 
2001-11-07 WP 7D   Liaison statement to Working Parties 1A and 1B - Collaboration on the compatibility study between ultra wideband (UWB) emissions and the radio astronomy service     N/A  
[ 45 ]  
 
2001-11-07 WP 7C   Liaison statement to WPs 1A and 1B - Compatibility between ultra wideband (UWB) emissions and radiocommunication services     N/A  
[ 44 ]  
 
2001-11-07 Chairman, WP 1B   Report from Working Party 1B     N/A  
[ 43 ]  
 
2001-11-07 WP 1B   Chairman's Report     N/A  
[ 42 ]  
 
2001-11-07 United States of America   Draft revision of Recommendation ITU-R SM.1538 - Technical and operating parameters and spectrum requirements for short-range radiocommunication devices     N/A  
[ 41 ]  
 
2001-11-07 JTG 1-6-8-9   Liaison statement to Working Parties 1B, 6E, 6M, 8A, 8F, 9B and JRG 8A-9B - Terrestrial wireless interactive multimedia systems     N/A  
[ 40 ]  
 
2001-11-07 WP 4A   Liaison statement from Working Party 4A     N/A  
[ 39 ]  
 
2001-11-07 JTG 1-6-8-9   Liaison statement from JTG 1-6-8-9 - Terrestrial wireless interactive multimedia systems     N/A  
[ 38 ]  
 
2001-11-07 ITU-D Study Groups 1 and 2   Liaison statement to ITU-R Study Group 1 and Working Party 1B     N/A  
[ 37 ]  
 
2001-11-07 BRSGD   List of documents issued     N/A  
[ 36 ]  
 
2001-11-07 WP 8A   Liaison statement to Working Parties 1A, 1B and Study Group 1 - Compatibility between ultra wideband (UWB) emissions and radiocommunication services     N/A  
[ 35 ]  
 
2001-11-07 Korea (Republic of)   Technical and operating parameters and spectrum requirements for short-range radiocommunication devices in Korea     N/A  
[ 34 ]  
 
2001-11-07 WP 8B   Liaison statement to Working Party 1A - Study of interference from short-rang radio devices using ultra-wideband (UWB) technology opertaing in the 1-6 GHz band     N/A  
Results:83 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2002-10-31