International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : SG07 : Circulars  Recently posted -  Search Meeting Documents
   
ITU-R SG07  CIR 

ITU-R SG07

Science services

Results:22 total items.
Circulars
 
Number 
Received Source Title
[ 55 ]  
 
2011-05-16 Director, BR   Meetings of Working Parties 7A, 7B, 7C and 7D (26 - 30 September 2011)    
[ 54 ]  
 
2010-10-28 SG 7   Proposed adoption by correspondence of 1 draft revised Recommendation    
[ 53 ]  
 
2010-07-01 Director, BR   Meetings of Working Parties 7A, 7B, 7C and 7D - Geneva, 5-11 October 2010    
[ 52 ]  
 
2010-03-25 Director, BR   Meetings of Working Parties 7B, 7C and 7D (10 - 18 June 2010)    
[ 51 ]  
 
2009-10-08 SG 7   Proposed adoption by correspondence of 1 draft new Recommendation and 1 draft revised Recommendation    
[ 50 ]  
 
2009-06-04 Director, BR   Meetings of Working Parties 7A, 7B, 7C and 7D    
[ 49 ]  
 
2008-11-21 Director, BR   Meetings of Working Parties 7B, 7C and 7D, 16 - 20 February 2009    
[ 48 ]  
 
2008-07-07 Director, BR   Meetings of Working Parties 7A, 7B, 7C and 7D    
[ 47 ]  
 
2007-11-26 Director, BR   Meetings of Working Parties 7A, 7B, 7C and 7D    
[ 46 ]  
 
2007-04-02 Director, BR   Meeting of Working Party 7A    
[ 45 ]  
 
2006-11-23 Director, BR   Meetings of Working Parties 7B, 7C and 7D in conjunction with a meeting of Radiocommunication Study Group 7    
[ 44 ]  
 
2006-05-08 Director, BR   Meetings of Working Parties 7A, 7B, 7C and 7D    
[ 43 ]  
 
2005-12-01 SG 7   Proposed adoption by correspondence of 1 draft revised Recommendation    
[ 42 ]  
 
2005-08-08 Director, BR   Meetings of Working Parties 7A, 7B, 7C and 7D in conjunction with a meeting of Radiocommunication Study Group 7    
[ 41 ]  
 
2004-12-06 Director, BR   Meetings of Working Parties 7B, 7C and 7D    
[ 40 ]  
 
2004-06-18 Director, BR   Meetings of Working Parties 7A, 7B, 7C and 7D    
[ 39 ]  
 
2003-12-16 Director, BR   Meetings of Working Parties 7B, 7C and 7D    
[ 38 ]  
 
2003-07-24 Director, BR   Meetings of Working Parties 7A, 7B, 7C and 7D    
[ 37 ]  
+Add.1 
2002-06-03 Director, BR   [7/LCCE/37] Meetings of Working Parties 7A, 7B, 7C and 7D    
[ 36 ]  
+Add.1 
2002-02-15 Director, BR   [7/LCCE/36, 4/LCCE/75, 8/LCCE/110] Meeting of Joint Task Group 4-7-8 (Sharing in the band 13.75-14 GHz)    
[ 35 ]  
+Add.1 
2002-01-29 Director, BR   [7/LCCE/35] Meeting of Working Party 7E (Inter-service sharing and compatibility)    
[ 34 ]  
+Add.1 
2002-01-21 Director, BR   [7/LCCE/34, 4/LCCE/73, 8/LCCE/107, 9/LCCE/70] Third meeting of Joint Task Group 4-7-8-9 on 5 GHz band allocations (Resolution 736 (WRC-2000))    
Results:22 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2010-07-05