Committed to connecting the world

  •  
wtisd

ITU-T Recommendations

Search by number:
Others:
Skip Navigation Links
Content search
Advanced search
Provisional name
Equivalent number
Formal description
Study Groups tree viewExpand Study Groups tree view

ITU-T K.45 (04/2008)

عربي | 中文 | English | Español | Français | Русский
Resistibility of telecommunication equipment installed in the access and trunk networks to overvoltages and overcurrents
Recommendation ITU-T K.45 specifies resistibility requirements and test procedures for telecommunication equipment installed between telecommunication centres and between a telecommunication centre and customer's premises building.Overvoltages or overcurrents covered by this Recommendation include surges due to lightning on or near the line plant, short-term induction from adjacent a.c. power lines or railway systems, earth potential rise due to power faults, direct contact between telecommunication lines and power lines and electrostatic discharges.Major changes compared with the 2003 version of this Recommendation include:
• removing the power induction test requirement for antenna ports where the installation is within the scope of Recommendation ITU-T K.71.
Citation: https://handle.itu.int/11.1002/1000/9404
Series title: K series: Protection against interference
Approval date: 2008-04-13
Provisional name:K.ran
Approval process:AAP
Status: Superseded
Maintenance responsibility: ITU-T Study Group 5
Further details: Patent statement(s)
Development history
[8 related work items in progress]