CONTENTS

 1     Introduction
 2     MTP management functions
        2.1     General
        2.2     Network routing management – MTP Routing Verification Test (MRVT)
                  2.2.1     General procedure considerations
                  2.2.2     The MRVT messages
                  2.2.3     Initiation of the MRVT procedure at a signalling point
                  2.2.4     The MRVT procedure
        2.3     Reception of a message for an unknown destination
        2.4     Timer definition and values
                  2.4.1     MRVT timers
                  2.4.2     Performance time definitions and values
        2.5     OMAP model for MRVT
                  2.5.1     Mapping of primitives
                  2.5.2     State transition diagrams for MRVT – Logic in the OMASE-User
 3     SCCP management functions
        3.1     General
        3.2     Network routing management – SCCP Routing Verification Test
                  3.2.1     Requirements upon an SCCP Routing Verification Test (SRVT)
                  3.2.2     Specific SCCP Routing Verification Tests
                  3.2.3     OMAP model for SRVT
 4     Circuit management functions
        4.1     General
        4.2     Circuit Validation Test (CVT)
                  4.2.1     The test
                  4.2.2     CVT State Transition Diagrams
Annex A
        A.1     Detailed model of the OMASE-User
        A.2     MIS-User to management process interface
Annex B
        B.1     Example of successful MRVT
        B.2     Example of unsuccessful test (STP X does not know initiator I)
        B.3     Example of "unknown initiator" response with copyData parameter