1) Scope
2) Clause 2.2 Informative references
3) Bibliography
4) Convention
5) New Appendix VII - European event packages
6) New Appendix VIII - Application of the NCS protocol to a SCN
IPAT
VIII.1 Overview
VIII.2 IPAT Architecture
VIII.3 Electrical and physical interface
requirements
VIII.4 NCS package for V5 SCN protocol
messages
VIII.4.1 Cadence-ringing request
VIII.4.2 Pulsed signal request
VIII.4.3 Pulse repetition encoding
VIII.4.4 Parameter usage
VIII.4.5 Pulsed signal cancellation
VIII.4.6 Pulsed completion event
VIII.4.7 Pulsed signal failure event
VIII.4.8 Steady-signal request
VIII.4.9 Metering pulse generation
VIII.5 Provisioning CONFIGURATIONS
VIII.5.1 MTA
VIII.5.2 IPAT
VIII.6 European line package support
VIII.6.1 NCS Audit
VIII.6.2 Unsupported signals – PICS declaration
VIII.7 Call flow examples
VIII.7.1 Cadence ringing
VIII.7.2 Pulsed signal request
VIII.7.3 Fixed meter pulse application, completed
VIII.7.4 Steady signal line treatment
7) New Appendix IX – Meeting support for IPCablecom NCS
IX.1 Objectives
IX.2 Automatic metering package
IX.2.1 Package name
IX.2.2 Local connection options
IX.2.3 Events and signals
IX.2.4 Properties
IX.2.5 Statistics
IX.2.6 Procedures
IX.3 Use cases, example call flows
IX.3.1 Meter pulse while off hook
IX.3.2 Meter pulse while on hook
IX.3.3 Regular call charge
IX.3.4 Call set-up charge
IX.3.5 Mid-call tariff change
IX.3.6 Mid-call add-on charge
IX.3.7 End of call
IX.3.8 Audit endpoint
IX.4 Terms