Table of Contents

 1     Scope          
        1.1     Application of this Recommendation  
        1.2     Transport network layers         
        1.3     Allocation of end-to-end performance              
 2     References               
 3     Terms and Definitions          
 4     Abbreviations          
 5     Measurement of the block
        5.1     In-service monitoring 
        5.2     Out-of-service measurements              
 6     Performance monitoring at the near end and far end of a path         
 7     Relationship between path performance monitoring and the block-based parameters          
        7.1     General            
        7.2     Estimation of the performance parameters     
        7.3     Estimation of performance events at the far end of a path       
 8     Error performance objectives           
        8.1     End-to-end objectives               
        8.2     Hypothetical reference optical path    
        8.3     Allocation of end-to-end performance objectives        
Annex A – Criteria for entry to and exit from the unavailable state    
        A.1     Criteria for a single direction   
        A.2     Criterion for a bidirectional path           
        A.3     Criterion for a unidirectional path        
        A.4     Consequences on error performance measurements
Appendix I – Flow chart illustrating the recognition of anomalies, defects, errored blocks, and SES    
Appendix II – Example of OTN layer network trails    
Bibliography