Policy on Intellectual Property Right (IPR)
1 Introduction
2 Study 1 – Spectrum
requirements in the context of WRC-12 Agenda item 1.25 (4‑16 GHz
range)
2.1 MSS –
Evolution towards broadband
2.2 Market
forecasts in the 1-16 GHz range
2.3 Methodology
2.4 Input
parameters
2.5 Results of
calculations
3 Study 2
3.1 Introduction
3.2 Estimation of
the number of broadband MSS users and data requirements
3.2.1 Land
mobile MSS users
3.2.2 Maritime
mobile MSS users
3.2.3 Aeronautical
mobile MSS users
3.2.4 Summary
of user assumptions
3.3 Calculation of
the spectrum requirements
4 Overall MSS spectrum
requirements
5 Summary
Annex 1
Annex 2 Example calculation of spectrum requirements
for an MSS network