CONTENTS

Policy on Intellectual Property Right (IPR)
 1     Introduction
 2     Study 1 – Spectrum requirements in the context of WRC-12 Agenda item 1.25 (4‑16 GHz range)
        2.1     MSS – Evolution towards broadband
        2.2     Market forecasts in the 1-16 GHz range
        2.3     Methodology
        2.4     Input parameters
        2.5     Results of calculations
 3     Study 2
        3.1     Introduction
        3.2     Estimation of the number of broadband MSS users and data requirements
                  3.2.1     Land mobile MSS users
                  3.2.2     Maritime mobile MSS users
                  3.2.3     Aeronautical mobile MSS users
                  3.2.4     Summary of user assumptions
        3.3     Calculation of the spectrum requirements
 4     Overall MSS spectrum requirements
 5     Summary
Annex 1
Annex 2  Example calculation of spectrum requirements for an MSS network