>> Study Group 19 : Mobile telecommunication networks
Approval of Draft New Recommendations
Meeting resulted in AAP Consent of two Draft New Recommendations
| ITU-T Document |
Title |
Question |
Status |
TD No. |
| Recommendation Q.1706 |
Mobility Management Requirements for NGN |
2/19 and 6/13 |
New |
TD 397R1
Also available as SG 13 TD
190 PLEN |
| Recommendation Q.1742.5 |
IMT-2000 References (approved as of 31 December 2005) to ANSI-41
evolved Core Network with cdma2000 Access Network |
3/19 |
New |
TD 379R1 |
Key results of individual Questions
Q.1/19 "Service and network capability requirements and network architecture"
- substantially progressed draft new Recommendation “Functional Network
Architecture for Systems Beyond IMT-2000 (Q.FNAB)” found in
TD 403R1
- reviewed and agreed on a work plan for Q.1/19 which aims to bring the
work on Q.FNAB to completion per the current schedule.
Joint Q.2/19, Q.5/19 and Q.6/13 - Mobility management
Questions Q.2/19 “Mobility management”, Q.5/19 “Convergence of evolving
IMT-2000 networks with evolving fixed networks” and Q.6/13 “NGN mobility and
fixed-mobile convergence” met jointly.
Key results are:
- many contributions were submitted which resulted in a very active and
productive technical discussion on draft new Recommendations Q.MMF, Q.LMF,
and Q.HMF, and Q.MMF was restructured to improve its coherency
- completed draft new Recommendation Q.MMR (“Mobility Management
Requirements for NGN”) to be proposed for AAP Consent in the SG 19 plenary
- progressed draft new Recommendations
MMF,
LMF and
HMF and these are on
track for completion per the work plan.
Q.3/19 “Identification of existing and evolving IMT-2000 systems”
- prepared draft Recommendation Q.1742.5 to be proposed for AAP
Consent in the SG 19 plenary
- initiated development of draft new Recommendations Q.1741.5 “IMT-2000
references to Release 7 of GSM evolved UMTS core network” and Q.1742.6 “IMT
2000 References (approved as of 31 December 2006) to ANSI-41 evolved Core
Network with cdma2000 Access Network”.
Q.4/19 “Preparation of a handbook on IMT-2000”
- baseline text towards the second edition of the Handbook on
Deployment of IMT-2000 Systems was reviewed and adopted
- a new chapter on billing received from ITU-T WP 1/3 was adopted.
Joint Q.2/19, Q.5/19 and Q.6/13 - Fixed-mobile convergence
- progressed draft new Recommendation
Q.FMC-PAU to the point where it
is considered to be a stable draft
- progressed draft new Recommendation
Q.FMC-REQ which is on track for
completion per the work plan
- progressed draft new Recommendation
Q.FMC-IMS which is on track for
completion per the work plan.
Next Generation Networks and SG 19’s Role
It was agreed that SG 19 would conduct the approval process for mobility
management and fixed-mobile convergence deliverables being worked in the joint
activities of Q.2/19, Q.5/19 and Q.6/13. This recognizes the joint work and the
effective teaming demonstrated by the three Rapporteurs involved, the strong
spirit of cooperation and desire to progress the work shown by the participants,
and the applicability of the work to the overall effort in the NGN-GSI.
Updating the NGN work plan on mobility management and fixed-mobile
convergence
Consistent with the above, the deliverables for mobility management and
fixed-mobile convergence are relabelled as follows:
|
Rec. |
ST |
Q. |
SG |
| Q.MMF |
N |
2/19 joint with Q.6/13 |
19 |
| Q.LMF |
N |
2/19 joint with Q.6/13 |
19 |
| Q.HMF |
N |
2/19 joint with Q.6/13 |
19 |
| Q.FMC-Req |
N |
5/19 joint with Q.6/13 |
19 |
| Q.FMC-PAU |
N |
5/19 joint with Q.6/13 |
19 |
| Q.FMC-IMS |
N |
5/19 joint with Q.6/13 |
19 |
Open Access to SG 19 Documentation
The trial of public access to SG 19 documents in under way in SG 19. All the
publicly accessible documents, including public versions of previous meeting
reports, are available at
www.itu.int/ITU-T/studygroups/com19/docs.
No issues or concerns of any sort have arisen as a result of the open and public
access to these documents to date.
SG 19 New Coordinators
Mr Oscar Lopez-Torres (Interdigital, USA) was nominated and confirmed as the SG
19 EDH Coordinator at the closing plenary.
Future plans
Rapporteur electronic meetings:
| Date(s) |
Question |
10 – 24 October
2006
|
Q.1/19 |
| 9 - 23 January
2007 |
Q.1/19 (e-meeting
or physical meeting; to be decided) |
| 22 - 26 January
2007 |
Q.5/19 and Q.6/13 |
Rapporteur meetings:
| Date(s) |
Questions |
Location |
| 30 October – 2
November 2006 |
Q.5/19 and Q.6/13 |
Geneva,
Switzerland |
| ‘’ |
Q.2/19 and Q.6/13 |
‘’ |
SG 19 meeting:
| Date(s) |
Location |
| 19 - 26 April 2007 |
Geneva, Switzerland |
|