International Telecommunication Union   ITU
عربي  |  中文  |  Español  |  Français  |  Русский
 
 Advanced Search Advanced Search Site Map Contact us Print Version
 
Home : ITU-T Home
   
ITU-T Study Group 15 (Study Period 2005-2008)
Optical and other transport network infrastructures
WP1/15 interim activities
WP Q. Topic Agenda Date Location and Host
1/15 2/15 Progression of G.984.x series Recommendations, G.985 and G.gbe
  • To progress OMCI for Reach extension
  • To progress OMCI for VLAN and updates
  • To progress “G.985 Amendment 1 100 Mbit/s point-to-point Ethernet based optical access system”
  • Requirements for 1 Gbit/s P2P optical access systems
  • Traffic Management
  • To progress the G.984.4 Implementers’ Guide
  • Update on Power saving and next steps
  • Showcase event update
  • Liaison
17 – 18 April 2008 Tokyo, Japan
Hosted by NEC
1/15 2/15 Progression of G.984.x series Recommendations, G.985 and G.gbe Agenda will be based upon the topics above plus others to be determined 26 – 27 June 2008 Stockholm, Sweden
Hosted by Ericsson
1/15 2/15 Progression of G.984.x series Recommendations, G.985 and G.gbe Agenda will be based upon the topics above plus others to be determined 12 September 2008 Shanghai, China Hosted by ZTE
1/15 4/15 Progression of Home Networking Recommendations To progress draft new Recommendation G.hn 17 - 20 March 2008 Nashville, TN, USA
Hosted by Infineon Technologies
1/15 4/15 Progression of xDSL and Home Networking Recommendations To progress draft new Recommendations G.hn, G.lt, G.inp & G.vector

To progress other DSL Recommendations as required
7 - 11 April 2008 Charleston, SC, USA
Hosted by Infineon Technologies
1/15 4/15 Progression of xDSL and Home Networking Recommendations To progress draft new Recommendations G.hn, G.lt, G.inp & G.vector

To progress other DSL Recommendations as required
16 - 20 June 2008 Antwerp, Belgium
Hosted by Alcatel-Lucent
1/15 4/15 Progression of xDSL and Home Networking Recommendations To progress draft new Recommendation G.hn 21 – 24 July 2008 Location:
Pruneyard, CA, USA
Hosted by Copper Gate and Ikanos
1/15 4/15 Progression of Home Networking Recommendations To progress draft new Recommendation G.hn 2 - 5 September 2008 Location:
Chicago, Il, USA
Hosted by HomeGrid
1/15 4/15 Progression of xDSL and Home Networking Recommendations To progress draft new Recommendations G.hn, G.lt, G.inp & G.vector

To progress other DSL Recommendations as required
15 - 19 September 2008 Location:
Campbell, CA, USA
Hosted by 2-wire
1/15 4/15 Progression of Home Networking Recommendations To progress draft new Recommendation G.hn 20 - 24 October 2008 Location:
Valencia, Spain
Hosted by DS2
1/15 4/15 G.hn review Review the draft Recommendation

Address any technical issues

Carry out an editorial clean-up
first week of November 2008 Tampa area, Florida, USA


WP2/15 interim activities
WP Q. Topic Agenda Date Location/Host
2/15 6/15 - to progress draft revised G.698.2 with respect to the inclusion of 40G application codes and 10G application codes at 50 GHz channel spacing;

- to progress draft revised G.Sup39 with respect to the inclusion of descriptions of advanced modulation formats;

- to progress the work on the choice of the OTU4 bit rate, especially in relation to the choice of suitable modulation formats, including initial considerations on implementations of a short-reach OTU4 interface;

- to consider documents relating to revised G.696.1, revised G.697 and 10Gbit/s applications for G.695

Clause 3.3.6
Report WP2
Week 23-27 June 2008 Munich,
on the kind invitation of
Nokia-Siemens
2/15 7/15 - to progress draft revised G.671, in particular with respect PON splitter issues, aiming to reach consent at the next SG15 meeting in December 2008;

- to progress G.666 thus also clarifying the direction of work towards an envisaged revision at the SG15 meeting in October 2009;

- to consider additional documents submitted on the above and other topics as time permits.

Clause 3.4.6
Report WP2


WP3/15 interim activities
WP Q. Topic Agenda Date Location/Host
3 9 G.8031, G.8032, Synchronous Ethernet, G.808.1, G.808.2
  • G.8031 including comment resolution, if necessary.
  • G.8032 including comment resolution, if necessary.
  • Synchronous Ethernet
  • G.808.1
  • G.808.2
28 April-2 May 2008 Miami/ATIS
3 9  
  • Progress the work on G.8032 and G.8031
4-8 August 2008 Galway/Nortel
3 9 G.8021, G.8031, G.8032, T-MPLS
  • G.8021
  • G.8031
  • G.8032
  • T-MPLS issues (G.8121 and G.8132)
22-26 September 2008 Jeju Island, South Korea
3 11 Remaining February contributions, OTN, Ethernet Services
  • Continue review of contributions that were left from the February 2008 plenary
  • Progress definition of OTN hierarchy
  • Define requirements for ODU0/sub-ODU1 and mapping of client signals into it
  • Refine priority list with client signals
  • Progress work on the G.8011.x series of recommendations.
 
2-6 June 2008 Sophia Antipolis/ETSI
3 11 OTN, GMP, G.8112, partially joint with Q9
  • Progress work on the G.8011.x series of Recommendations
  • Progress definition of OTN hierarchy
  • Define requirements for ODU0 and mapping of client signals into ODU0
  • Progress T-MPLS NNI G.8112
22-26 September 2008 Jeju Island, South Korea
3 12 Ethernet and G.800
  • Advance work on G.800
    • Prepare amendment 2 for consent in December 2008
    • Continue the alignment of G.800 and G.8010/G.806 terminology and concepts.
  • Ethernet
    • Complete development of the model for PB
    • Complete development of the model for PBB
    • Continue work on the description of Provider VLAN Transport
    • Prepare a new version of G.8010 for consent in December 2008
    • Continue work on G.pbb-te
19-23 May 2008 Sophia Antipolis/ETSI
3 12+14 ASON, Transport equipment management, discovery, DCN, Ethernet, T-MPLS
  • Q12 and Q14 jointly: Advance work on ASON, G.8080 amendment 2 for consent in mid 2009 and G.7716, G.7713 series, G.7714 series, & G.7715 series
  • Q12: Complete the preparation of G.8010 for consent at the December 2008 meeting of SG 15.
    • This topic will only be addressed if the work is not completed at the Interregnum meeting in May.
  • Q12: Advance work on T-MPLS architecture (G.8110.1)
  • Q14: Advance work on transport equipment management (all technologies)
  • Q14: Advance work on DCN (G.7712) architecture and requirement
22-26 September 2008 Beijing/ZTE
3 13 G.paclock-bis, G.pacmod-bis, time and phase sync intra office interfaces, G.8261, G.8264
  • Progress work on G.paclock-bis
  • Progress work on G.pacmod-bis, and in particular address 1588 V2 telecom profile
  • Progress on packet based methods
  • Progress on time and phase synchronization, and intra office interfaces to transport time
  • G.8261 and G.8264, including comment resolution, if necessary
28 April-2 May 2008 Miami/ATIS
3 13 G.paclock-bis, G.pacmod-bis, time and phase sync intra office interfaces, G.8261, G.8264, test methods for packet networks
  • Progress work on G.paclock-bis
  • Progress work on G.pacmod-bis, and in particular address 1588 V2 telecom profile
  • Progress on packet based methods
  • Progress on time and phase synchronization, and intra office interfaces to transport time
  • Test methods for packet networks, including jitter and wander measurements
  • G.8261
22-26 September Rome/Ericsson

 

Top - Feedback - Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page : TSB EDH
Updated : 2008-11-03