International Telecommunication Union   ITU
عربي  |  中文  |  Español  |  Français  |  Русский
 
 Advanced Search Advanced Search Site Map Contact us Print Version
 
Home : ITU-D : Study Groups
   

ANNEX 5

Rapporteur's checklist

  1. Establish a group of collaborators, often referred to as a rapporteur's group, to participate in the progress of the study. An updated list of collaborators should be kept by BDT.
  2. Establish a work plan in consultation with the group of collaborators. The work plan should be reviewed periodically by the study group and contain the following:
  • list of tasks to be completed;
  • target dates for milestones;
  • results anticipated, including titles of output documents;
  • liaison required with other groups, and schedules for liaisons, if known;
  • proposed meeting(s) of rapporteur's group and estimated dates, with request for interpretation, if any.
  1. Adopt work methods appropriate to the group. Use of electronic document handling (EDH), electronic and facsimile mail to exchange views is strongly encouraged.
  2. Act as chairman at all meetings of the group of collaborators. If special meetings of the group of collaborators are necessary, give appropriate advance notice.
  3. Delegate portions of the work to vice-rapporteurs or other collaborators, depending on the workload.
  4. Keep the study group management team regularly informed of the work progress. In case no progress can be reported on a given Question between two study group meetings, the rapporteur should nevertheless submit a report indicating the possible reasons for the lack of progress. To allow the chairman and BDT to take the necessary steps for the work to be done on the Question, reports should be submitted at least two months before the study group meeting.
  5. Keep the study group informed of the progress of work through reports to study group meetings. The reports should be in the form of white contributions (when substantial progress has been made such as completion of draft recommendations or a report) or temporary documents.
  6. The progress report mentioned in §§ 6 and 7 above should, as far as applicable, comply with the format given in § 10.2 of section 1.
  7. Ensure that liaison statements are submitted as soon as possible after all meetings, with copies to the study group chairmen and BDT. Liaison statements must contain the information described on the Template for liaison statements described in Annex 4 to this resolution. BDT may provide assistance in distributing the liaison statements.
  8. Oversee the quality of texts up to and including the final text submitted for approval.

 

Top - Feedback - Contact Us -  Copyright © ITU 2016 All Rights Reserved
Contact for this page : BDT Web Support
Updated : 2009-10-28